6 Installation
Installer reference guide
19
AZQS100~14 AZQS100~140B7Y1B
Split system air conditioners
4P3855291 – 2014.08
a
b
V1
Y1
c
c
c
c
d
d
e
e
f
f
a
Switch box
b
Stop valve attachment plate
c
Earth
d
Cable tie
e
Interconnection cable
f
Power supply cable
4
Fix the cables (power supply and interconnection cable) with a
cable tie to the stop valve attachment plate.
5
Route the wiring through the frame and connect it to it.
Routing through
the frame
Choose one of the 3 possibilities:
a
b
a
b
a
b
2
3
1
a
Power supply cable
b
Interconnection cable
Connecting to the
frame
When cables are routed from the unit, a
protection sleeve for the conduits (PG
insertions) can be inserted at the knockout
hole.
When you do not use a wire conduit,
protect the wires with vinyl tubes to
prevent the edge of the knockout hole from
cutting the wires.
a b c
d
e
A B
A
Inside of the outdoor unit
B
Outside of the outdoor unit
a
Wire
b
Bush
c
Nut
d
Frame
e
Hose
6
Reattach the service cover. See
"6.8.2 To close the outdoor
unit" on page 20
.
7
Connect an earth leakage circuit breaker and fuse to the power
supply line.
6.8
Finishing the outdoor unit
installation
6.8.1
To finish the outdoor unit installation
1
Insulate and fix the refrigerant piping and interconnection cable
as follows:
f
b
a
e
d
c
a
Gas pipe
b
Gas pipe insulation
c
Interconnection cable
d
Liquid pipe
e
Liquid pipe insulation
f
Finishing tape
2
Install the service cover.