Turn the power supply on.

Result: 

The  flap  of  the  indoor  unit  will  open  and  close  to  set  the

reference position.

INFORMATION

▪ For  FTXF  units,  the  following  setting  MUST  be

completed  within  5  minutes  after  the  power  supply  is
turned on.

▪ In  case  you  could  NOT  complete  the  setting  in  time,

turn  the  power  supply  off  and  wait  at  least  1  minute
before turning the power supply back on.

4

Press simultaneously:

Model

Buttons

FTXP and ATXP

 and 

FTXF

 and 

5

Press:

Model

Button

FTXP and ATXP

FTXF

6

Select:

Model

Symbol

FTXP and ATXP

FTXF

7

Press:

Model

Button

FTXP and ATXP

FTXF

ON/OFF

a

b

a

Operation lamp

b

Indoor unit ON/OFF switch

8

Press  the  indoor  unit  ON/OFF  switch  while  the  operation  lamp
is blinking.

Jumper

Address

Factory setting

1

After cutting with nippers

2

INFORMATION

If the setting could NOT be completed while the operation
lamp  was  blinking,  repeat  the  setting  process  from  the
beginning.

9

When the setting is complete, press:

Model

Button

FTXP and ATXP

Keep 

 pressed for about

5 seconds.

FTXF

Result: 

 The user interface will return to the previous screen.

7

Commissioning

NOTICE

ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.

7.1

Checklist before commissioning

After  the  installation  of  the  unit,  first  check  the  items  listed  below.
Once all checks are fulfilled, the unit must be closed. Power-up the
unit after it is closed.

You  read  the  complete  installation  instructions,  as
described in the 

installer reference guide

.

The 

indoor units

 are properly mounted.

The 

outdoor unit

 is properly mounted.

Air inlet/outlet

Check  that  the  air  inlet  and  outlet  of  the  unit  is  NOT
obstructed  by  paper  sheets,  cardboard,  or  any  other
material.

There are NO 

missing phases

 or 

reversed phases

.

The 

refrigerant  pipes

  (gas  and  liquid)  are  thermally

insulated.

Drainage

Make sure drainage flows smoothly.

Possible consequence: 

Condensate water might drip.

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

fuses

  or  locally  installed  protection  devices  are

installed according to this document, and have NOT been
bypassed.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

The  specified  wires  are  used  for  the 

interconnection

cable

.

The indoor unit receives the signals of the 

user interface

.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

The 

insulation resistance

 of the compressor is OK.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

There are NO 

refrigerant leaks

.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

7.2

To perform a test run

Prerequisite: 

Power supply MUST be in the specified range.

Prerequisite: 

Test  run  may  be  performed  in  cooling  or  heating

mode.

Summary of Contents for ATXP20L5V1B

Page 1: ...al Daikin room air conditioner English Installation manual Daikin room air conditioner FTXP20L5V1B FTXP25L5V1B FTXP35L5V1B ATXP20L5V1B ATXP25L5V1B ATXP35L5V1B FTXF20A5V1B FTXF25A5V1B FTXF35A5V1B FTXF20B5V1B FTXF25B5V1B ...

Page 2: ...нти при условие че се използват съгласно нашите инструкции atitinka žemiau nurodytus standartus ir arba kitus norminius dokumentus su sąlyga kad yra naudojami pagal mūsų nurodymus tad ja lietoti atbilstoši ražotāja norādījumiem atbilst sekojošiem standartiem un citiem normatīviem dokumentiem sú v zhode s nasledovnou ými normou ami alebo iným i normatívnym i dokumentom ami za predpokladu že sa použ...

Page 3: ... се използват съгласно нашите инструкции atitinka žemiau nurodytus standartus ir arba kitus norminius dokumentus su sąlyga kad yra naudojami pagal mūsų nurodymus tad ja lietoti atbilstoši ražotāja norādījumiem atbilst sekojošiem standartiem un citiem normatīviem dokumentiem sú v zhode s nasledovnou ými normou ami alebo iným i normatívnym i dokumentom ami za predpokladu že sa používajú v súlade s n...

Page 4: ...gmis t e standardi te ga või teiste normatiivsete dokumentidega kui neid kasutatakse vastavalt meie juhenditele съответстват на следните стандарти или други нормативни документи при условие че се използват съгласно нашите инструкции atitinka žemiau nurodytus standartus ir arba kitus norminius dokumentus su sąlyga kad yra naudojami pagal mūsų nurodymus tad ja lietoti atbilstoši ražotāja norādījumie...

Page 5: ...eep it for future reference Target audience Authorised installers INFORMATION This appliance is intended to be used by expert or trained users in shops in light industry and on farms or for commercial and household use by lay persons Documentation set This document is part of a documentation set The complete set consists of General safety precautions Safety instructions that you MUST read before i...

Page 6: ... acid deoxidised seamless copper for refrigerant Foreign materials inside pipes including oils for fabrication must be 30 mg 10 m Refrigerant piping diameter Use the same diameters as the connections on the outdoor units Class L1 liquid piping L1 gas piping 20 35 Ø6 4 Ø9 5 Refrigerant piping material Piping material Phosphoric acid deoxidised seamless copper Flare connections Only use annealed mat...

Page 7: ...ss 20 35 back on the front grille 3 Install the air filter and then mount the front panel To remove the electrical wiring box cover 1 Remove the front grille 2 Remove 1 screw from the electrical wiring box 3 Open the electrical wiring box cover by pulling the protruding part on the top of the cover 4 Unhook the tab on the bottom and remove the electrical wiring box cover a a c b a 1 3 2 a Tab b Pr...

Page 8: ...1 Bore a 65 mm large feed through hole in the wall with a downward slope towards the outside 2 Insert a wall embedded pipe into the hole 3 Insert a wall cover into the wall pipe Ø65 a b c a Wall embedded pipe b Putty c Wall hole cover 4 After completing wiring refrigerant piping and drain piping do NOT forget to seal the gap with putty 5 2 3 To remove the pipe port cover To connect the piping on r...

Page 9: ...milarly qualified persons in order to avoid a hazard WARNING Do NOT connect the power supply to the indoor unit This could result in electrical shock or fire WARNING Do NOT use locally purchased electrical parts inside the product Do NOT branch the power supply for the drain pump etc from the terminal block This could result in electrical shock or fire WARNING Keep the interconnection wiring away ...

Page 10: ...sory f Bottom frame 5 5 2 To pass the pipes through the wall hole 1 Shape the refrigerant pipes along the pipe path marking on the mounting plate a b c c d e a Drain hose b Caulk this hole with putty or caulking material c Adhesive vinyl tape d Insulation tape e Mounting plate accessory NOTICE Do NOT bend refrigerant pipes Do NOT push the refrigerant pipes onto the bottom frame or the front grille...

Page 11: ...stallation of the unit first check the items listed below Once all checks are fulfilled the unit must be closed Power up the unit after it is closed You read the complete installation instructions as described in the installer reference guide The indoor units are properly mounted The outdoor unit is properly mounted Air inlet outlet Check that the air inlet and outlet of the unit is NOT obstructed...

Page 12: ...ing the air conditioner in Cooling mode in winter set it to test run operation using the following method For FTXP and ATXP units 1 Press and simultaneously 2 Press 3 Select 4 Press 5 Press to switch the system on Result Test run operation will stop automatically after about 30 minutes 6 To stop operation press For FTXF units 7 Press to switch the system on 8 Press the centre of and simultaneously...

Page 13: ... DS DIP SWITCH E H HEATER F U FU FOR CHARACTERISTICS FUSE REFER TO PCB INSIDE YOUR UNIT FG CONNECTOR FRAME GROUND H HARNESS H P LED V L PILOT LAMP LIGHT EMITTING DIODE HAP LIGHT EMITTING DIODE SERVICE MONITOR GREEN HIGH VOLTAGE HIGH VOLTAGE IES INTELLIGENT EYE SENSOR IPM INTELLIGENT POWER MODULE K R KCR KFR KHuR K M MAGNETIC RELAY L LIVE L COIL L R REACTOR M STEPPER MOTOR M C COMPRESSOR MOTOR M F ...

Page 14: ......

Page 15: ......

Page 16: ...LERİ SAN TİC A Ş İSTANBUL TÜRKİYE Tel 0216 453 27 00 Faks 0216 671 06 00 Çağrı Merkezi 444 999 0 Web www daikin com tr Gülsuyu Mahallesi Fevzi Çakmak Caddesi Burçak Sokak No 20 34848 Maltepe 3P519299 1H 2019 09 Copyright 2019 Daikin ...

Reviews: