![Daikin ARXF50A5V1B Installation Manual Download Page 11](http://html.mh-extra.com/html/daikin/arxf50a5v1b/arxf50a5v1b_installation-manual_501317011.webp)
8 Finishing the outdoor unit installation
Installation manual
11
6 (A)RXF7 RXF50+6
RXP50~7 (A)RXM50+6 ARXM7
RXM42R5V1B
R32 split series
3P645642-1A – 2021.03
DANGER: RISK OF ELECTROCUTION
Disconnect the power supply for more than 10 minutes,
and measure the voltage at the terminals of main circuit
capacitors or electrical components before servicing. The
voltage MUST be less than 50 V DC before you can touch
electrical components. For the location of the terminals,
see the wiring diagram.
b
c
DC P1+
DC N1-
a
d
e
g
f
a
Multimeter (DC voltage range)
b
S80 – reversing solenoid valve lead wire
c
S20 – electronic expansion valve lead wire
d
S40 – thermal overload relay lead wire
e
S90 – thermistor lead wire
f
LED
g
S70 – fan motor lead wire
7.1
Specifications of standard wiring
components
Component
Power supply
cable
Voltage
220~240 V
Phase
1~
Frequency
50 Hz
Wire sizes
3-core cable
2.5 mm2~4.0 mm
2
H05RN-F (60245 IEC 57)
Interconnection cable
(indoor↔outdoor)
4-core cable
1.5 mm
2
~2.5 mm
2
and applicable for
220~240 V
H05RN-F (60245 IEC 57)
Recommended circuit breaker RXP50~71M
RXF50+60B
RXF71A
ARXF50~71A
20 A
(a)
ARXM50~71R
RXM50+60R
16 A
RXM42R
13 A
Earth leakage circuit breaker
MUST comply with applicable
legislation
(a)
Electrical equipment complying with EN/IEC 61000-3-12
(European/International Technical Standard setting the limits for
harmonic currents produced by equipment connected to public
low-voltage systems with input current >16 A and ≤75 A per
phase).
7.2
To connect the electrical wiring to
the outdoor unit
1
Remove the service cover.
2
Remove the switch box cover.
3
Open the wire clamp.
4
Connect the interconnection cable and power supply as follows:
50 Hz
220-240 V
c
d
f
a
b
e
a
Interconnection cable
b
Power supply cable
c
Circuit breaker
d
Residual current device
e
Power supply
f
Earth
1 2 3
3×
5
Tighten the terminal screws securely. We recommend using a
Phillips screwdriver.
6
Install the switch box cover.
8
Finishing the outdoor unit
installation
8.1
To finish the outdoor unit
installation
DANGER: RISK OF ELECTROCUTION
▪ Make sure that the system is earthed properly.
▪ Turn off the power supply before servicing.
▪ Install the switch box cover before turning on the power
supply.
1
Insulate and fix the refrigerant piping and cables as follows:
g
b
a
f
e
c
d
a
Gas pipe
b
Gas pipe insulation
c
Interconnection cable
d
Field wiring (if applicable)
e
Liquid pipe
f
Liquid pipe insulation
g