10
|
Finishing the outdoor unit installation
Installer reference guide
122
EBLA09~16DA + EDLA09~16DA
Daikin Altherma 3 M
4P620241-1 – 2020.06
10 Finishing the outdoor unit installation
10.1 To check the insulation resistance of the compressor
NOTICE
If, after installation, refrigerant accumulates in the compressor, the insulation
resistance over the poles can drop, but if it is at least 1 MΩ, then the unit will not
break down.
▪
Use a 500 V mega-tester when measuring insulation.
▪
Do NOT use a mega-tester for low voltage circuits.
1
Measure the insulation resistance over the poles.
If
Then
≥1 MΩ
Insulation resistance is OK. This procedure is
finished.
<1 MΩ
Insulation resistance is not OK. Go to the next step.
2
Turn ON the power and leave it on for 6 hours.
Result:
The compressor will heat up and evaporate any refrigerant in the
compressor.
3
Measure the insulation resistance again.
Summary of Contents for ALTHERMA
Page 277: ...11 11 ...
Page 278: ......
Page 279: ......
Page 280: ...4P620241 1 2020 06 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...