ESIE09-08A
Test Operation
Test Operation
79
1.1.2
Turn Power On
Turn outdoor unit p ower on .
Turn indoor unit p ower on .
(V3056)
Be sure to turn the power on 6 hours before starting operation to
protect compressors.
Close outside panels of the outdoor unit.
Wait until initialization period is over (up to 12 min).
(Can be known by checking leds on outdoor PCB - see “Field
Settings from Outdoor unit” for details.
Car ry out the test run as
desc ribed in the installation
manual of the indoor unit
Carry out field setting, if
necessary
Summary of Contents for ALTHERMA HT EKBUHAA6 V3
Page 2: ......
Page 7: ...ESIE09 08A Table of Contents v 1 3 Service Tools 283 Index i Drawings Flow Charts iii ...
Page 16: ...Model Names of Indoor Outdoor Units Tanks ESIE09 08A 4 General Information ...
Page 28: ...Refrigerant Circuit ESIE09 08A 16 Refrigerant Circuit EKHBRD 011 014 016 AB AC V1 Y1 ...
Page 40: ...Functional Parts Layout ESIE09 08A 28 Refrigerant Circuit ...
Page 63: ...ESIE09 08A PCB Layout for EKHBRD 011 014 016 AA AB AC V1 Y1 Refrigerant Circuit 51 ...
Page 64: ...PCB Layout for EKHBRD 011 014 016 AA AB AC V1 Y1 ESIE09 08A 52 Refrigerant Circuit ...
Page 125: ...ESIE09 08A Field Setting Test Operation 113 ...
Page 232: ...Troubleshooting by Indication on the Remote Controller ESIE09 08A 222 Troubleshooting ...
Page 237: ...ESIE09 08A Piping Diagrams Appendix 227 EKHBRD 011 014 016 AB AC V1 Y1 ...
Page 250: ...Wiring Diagrams ESIE09 08A 240 Appendix EKHBRD 011 014 016 AB AC V1 ...
Page 251: ...ESIE09 08A Wiring Diagrams Appendix 241 ...
Page 256: ...Wiring Diagrams ESIE09 08A 246 Appendix EKHBRD 011 014 016 AB AC Y1 ...
Page 257: ...ESIE09 08A Wiring Diagrams Appendix 247 ...
Page 260: ...Wiring Diagrams ESIE09 08A 250 Appendix ...