
Removal procedure: outdoor unit ERYQ005~007AAV3
ESIE06-03
5–18
Part 5 – Disassembly and Maintenance
3
1
55
2.5
Removal of the PCB
Warning
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure
Step
Procedure
Points
P
Remove the electrical box.
1
Remove the PCB.
1
Disconnect the
connectors for the
control PCB (S52,
S102).
2
Undo the 4 clamps by
pliers.
3
Loosen the fixing screw
of the cable way board
and disconnect the
earth wire.
4
Undo the hook on the
right.
Clamps
Earth wire
Summary of Contents for Altherma EKHBH Series
Page 2: ...ESIE06 03 1 2 Part 1 System Outline 3 1 1 5 ...
Page 26: ...Functional Diagrams ESIE06 03 1 26 Part 1 System Outline 3 1 1 4 5 ...
Page 32: ...Piping Diagrams ESIE06 03 1 32 Part 1 System Outline 3 1 1 4 5 ...
Page 38: ...Switch Box Layout ESIE06 03 1 38 Part 1 System Outline 3 1 1 4 5 ...
Page 58: ...PCB Layout ESIE06 03 1 58 Part 1 System Outline 3 1 1 4 5 ...
Page 60: ...ESIE06 03 2 2 Part 2 Functional Description 3 1 2 5 ...
Page 68: ...Hydro box Functional Concept ESIE06 03 2 10 Part 2 Functional Description 3 1 2 4 5 ...
Page 88: ...ESIE06 03 3 2 Part 3 Troubleshooting 3 1 3 5 ...
Page 134: ...Error Codes System Malfunctions ESIE06 03 3 48 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 152: ...Additional Checks for Troubleshooting ESIE06 03 3 66 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 154: ...ESIE06 03 5 2 Part 5 Disassembly and Maintenance 3 1 5 ...