9
|
Electrical installation
Installer reference guide
96
EWSAH/X06D
Daikin Altherma 3 WS
4P675764-1 – 2022.04
1~
M
M2P
1×
2×
X2M
1×
1 2
3
Fix the cable with cable ties to the cable tie mountings.
9.2.6 To connect the alarm output
Wires: (2+1)×0.75 mm²
Maximum load: 0.3 A, 250 V AC
[9.D]
Alarm output
1
"7.2.2 To open the indoor unit"
61]):
1
Top panel
3
2
5
1
4
2
User interface panel
3
Front panel
4
Installer switch box cover
5
Main switch box cover
2
Connect the alarm output cable to the appropriate terminals as shown in the
illustration below. Make sure to put wires 2 and 3 between the installer switch
box and main switch box in a cable sleeve (field supply) so that they are
double insulated.
14a 21
YC
Y1
X2M
1
2
3
2
A4P
b
a
1+2
Wires connected to the alarm output
3
Wire between the installer switch box
and main switch box
a
Installation of EKRP1HBAA is
required.
b
Cable sleeve (field supply)