![Daikin Altherma 3 R F EHVZ04S18E 6V Series Installer'S Reference Manual Download Page 199](http://html.mh-extra.com/html/daikin/altherma-3-r-f-ehvz04s18e-6v-series/altherma-3-r-f-ehvz04s18e-6v-series_installers-reference-manual_501222199.webp)
11
|
Commissioning
Installer reference guide
199
ERGA04~08EAV3(A) + 08S18+9W
Daikin Altherma 3 R F
4P629093-1 – 2020.08
4
Select
OK
to confirm.
Result:
The actuator test run starts. It stops automatically when
ready (±30 min).
To stop the test run manually:
—
1
In the menu, go to
Stop test run
.
2
Select
OK
to confirm.
Possible actuator test runs
▪
Backup heater 1
test
▪
Backup heater 2
test
▪
Pump
test
INFORMATION
Make sure that all air is purged before executing the test run. Also avoid disturbances
in the water circuit during the test run.
▪
Shut off valve
test
▪
Diverter valve
test (3-way valve for switching between space heating and
tank heating)
▪
Bivalent signal
test
▪
Alarm output
test
▪
C/H signal
test
▪
DHW pump
test
11.4.5 Underfloor heating screed dryout
About underfloor heating screed dryout
Purpose
The underfloor heating (UFH) screed dryout function is used for drying out the
screed of an underfloor heating system during the construction of the building.
NOTICE
The installer is responsible for:
▪
contacting the screed manufacturer for the maximum allowed water
temperature, to avoid cracking the screed,
▪
programming the underfloor heating screed dryout schedule according to the
initial heating instructions of the screed manufacturer,
▪
checking the proper functioning of the setup on a regular basis,
▪
performing the correct program complying with the type of the used screed.
UFH screed dryout before or during installation of outdoor unit
The UFH screed dryout function can be executed without finishing the outdoor
installation. In this case, the backup heater will perform the screed dryout and
supply the leaving water without heat pump operation.
Summary of Contents for Altherma 3 R F EHVZ04S18E 6V Series
Page 253: ......
Page 254: ......
Page 255: ......
Page 256: ...4P629093 1 2020 08 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...