3 About the box
Installation manual
6
EBSH/X(B)11+16P30+50DF
Daikin Altherma 3 R ECH
₂
O
4P663483-1A – 2021.11
WARNING
Field piping method MUST be in accordance with the
instructions
from
this
manual.
See
WARNING
The discharge pipes from the pressure relief valves MUST
terminate in a safe and visible position without forming any
risk to persons in the vicinity.
WARNING
▪ Discharge piping, tundish, drain valves, etc. MUST be
positioned away from any electrical components.
▪ The discharge pipe away from the tundish MUST
terminate in a safe, visible position without forming any
risk to persons in the vicinity.
WARNING
Install the tundish away from any electrical device.
Possible consequence:
Electrical shock or fire.
Electrical installation (see
DANGER: RISK OF ELECTROCUTION
WARNING
Electrical wiring connection method MUST be in
accordance with the instructions from this manual. See
22].
WARNING
▪ All wiring MUST be performed by an authorised
electrician and MUST comply with the applicable
legislation.
▪ Make electrical connections to the fixed wiring.
▪ All components procured on-site and all electrical
construction MUST comply with the applicable
legislation.
WARNING
ALWAYS use multicore cable for power supply cables.
WARNING
▪ If the power supply has a missing or wrong N-phase,
equipment might break down.
▪ Establish proper earthing. Do NOT earth the unit to a
utility pipe, surge absorber, or telephone earth.
Incomplete earthing may cause electrical shock.
▪ Install the required fuses or circuit breakers.
▪ Secure the electrical wiring with cable ties so that the
cables do NOT come in contact with sharp edges or
piping, particularly on the high-pressure side.
▪ Do NOT use taped wires, stranded conductor wires,
extension cords, or connections from a star system.
They can cause overheating, electrical shock or fire.
▪ Do NOT install a phase advancing capacitor, because
this unit is equipped with an inverter. A phase
advancing capacitor will reduce performance and may
cause accidents.
WARNING
The backup heater MUST have a dedicated power supply
and MUST be protected by the safety devices required by
the applicable legislation.
WARNING
If the supply cord is damaged, it MUST be replaced by the
manufacturer, its service agent or similarly qualified
persons in order to avoid a hazard.
CAUTION
Do NOT push or place redundant cable length in the unit.
CAUTION
To guarantee the unit is completely earthed, ALWAYS
connect the backup heater power supply and the earth
cable.
INFORMATION
Details of type and rating of fuses, or rating of circuit
breakers are described in
WARNING
Be aware that the domestic hot water temperature at the
hot water tap will be equal to the value selected in field
setting [2-03] after a disinfection operation.
When the high domestic hot water temperature can be a
potential risk for human injuries, a mixing valve (field
supply) shall be installed at the domestic hot water out
connection of the storage tank. This mixing valve shall
secure that the hot water temperature at the hot water tap
never rise above a set maximum value. This maximum
allowable hot water temperature shall be selected
according to the applicable legislation.
CAUTION
The disinfection function settings MUST be configured by
the installer according to the applicable legislation.
CAUTION
Make sure that the disinfection function start time [5.7.3]
with defined duration [5.7.5] is NOT interrupted by possible
domestic hot water demand.
44])
WARNING
Commissioning method MUST be in accordance with the
instructions
from
this
manual.
See
44].
3
About the box
3.1
Indoor unit
▪ At delivery, the unit MUST be checked for damage. Any damage
MUST be reported immediately to the claims agent of the carrier.
▪ Bring the packed unit as close as possible to its final installation
position to prevent damage during transport.
▪ Unpack the indoor unit completely according to the instructions
mentioned on the unpacking instructions sheet.
Summary of Contents for Altherma 3 R ECH2O
Page 51: ......