
9
|
Electrical installation
Installer reference guide
125
EPRA08~W1 + ETSH/X(B)12P30+50EF
Daikin Altherma 3 H MT ECH₂O
4P663478-1 – 2021.07
A
B
M2S
B
1418
X 2M
1
NO
B
13 18
X 2M
1
NC
A
3
Fix the cable with cable ties to the cable tie mountings. General information,
see
"9.3.1 To connect the electrical wiring to the indoor unit"
116].
9.3.6 To connect the electricity meters
Wires: 2 (per meter)×0.75 mm²
Electricity meters: 12 V DC pulse detection (voltage supplied by PCB)
[9.A]
Energy metering
INFORMATION
In case of an electricity meter with transistor output, check the polarity. The positive
polarity MUST be connected to X15M/5 and X15M/9; the negative polarity to X5M/5
and X5M/3.
1
Open the following (see
"7.2.5 To open the indoor unit"
1
User interface panel
1
3
4
2
2
Switch box
3
Switch box cover
4
Top cover
2
Connect the electricity meters cable to the appropriate terminals as shown in
the illustration below.
Summary of Contents for Altherma 3 H MT ECH2O
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ...4P663478 1 2021 07 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...