8.2.5 To fill the heating system
DANGER: RISK OF ELECTROCUTION
During the filling process, water can escape from any leaking point and can cause an
electrical shock if it comes into contact with live parts.
▪
Before the filling process, de-energise the unit.
▪
After the first filling and before switching on the unit with the mains switch, check
whether all electric parts and connection points are dry.
1
Connect a hose with a non-return valve (1/2") and an external manometer
(field supply) to a water tap and the fill and drain valve. Secure the hose
against slipping off.
j/k
e.1
B
AB
A
e.2
50%
(45%)
100%
0%
CH
Bypass
(B)
(A)
f
a
h
i
c
j
k
d
b
g
50% (67%)
100%
0%
CH
DHW
(A)
(B)
a
Hose with a non-return valve (1/2") and an external manometer (field supply)
b
Fill and drain valve
c
Space heating/cooling water OUT
d
Space heating/cooling water IN
e.1
Valve motor
e.2
Valve motor latch
f
Water tap
g
Automatic air purge valve
h
Pressure gauge (field supply)
i
Pressure vessel (field supply)
j
Bypass valve
k
Tank valve
2
Prepare for air purging according to the instructions (see
of the unit with the manual air vent valves"
241]).
3
Open the water tap.
4
Open fill and drain valve and monitor the manometer.
Summary of Contents for Altherma 3 H HT ETSX16E7
Page 308: ...19 19...
Page 309: ......
Page 310: ......
Page 311: ......
Page 312: ...4P679467 1B 2022 09 Copyright 2022 Daikin Verantwortung f r Energie und Umwelt...