6
|
Unit installation
Installer reference guide
30
3(A)MXM+3(A)MXF+4MXM+5MXM
R32 Split series
4P600463-1C – 2020.08
6.3.2 Precautions when mounting the outdoor unit
INFORMATION
Also read the precautions and requirements in the following chapters:
▪
"2 General safety precautions"
▪
"6.1 Preparing the installation site"
6.3.3 To provide the installation structure
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Use a vibration-proof rubber (field supply) in cases where vibrations may be
transmitted to the building.
The unit may be installed directly on a concrete veranda or another solid surface as
long as it provides proper drainage.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
Prepare 4 sets of M8 or M10 anchor bolts, nuts and washers (field supply).
20 mm
(mm)
353
600
240
240
a
a
100 mm above expected level of snow