![Daikin 18000 Btu Service Manual Download Page 15](http://html1.mh-extra.com/html/daikin/18000-btu/18000-btu_service-manual_502253015.webp)
Si002155E
PCBs / Thermistor ASSY
Removal Procedure
13
4. PCBs / Thermistor ASSY
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Step
Procedure
Points
1. Remove the service
monitor PCB.
The service monitor PCB
can be removed without
removing the electrical box.
When reassembling, make
sure that the 2 hooks are
securely fastened.
1
2
Remove the screw.
Unfasten the 2 hooks
and remove the switch
cover.
3
Unfasten the 4 hooks
and remove the service
monitor PCB cover.
When reassembling, make
sure that the 4 hooks are
securely fastened.
4
Disconnect the 2
connectors [S501] and
[S502] from the service
monitor PCB.
[S501], [S502]: main PCB
Switch cover
Right view
(R26195)
Hook
(R24861)
Hook
Hook
Service monitor PCB cover
(R26196)
[S501]
[S502]
(R26197)