Quick Start Guide
6
3
Installation
Packing List
The tools required for the installation including electric drill are not provided in the packing.
The operation manual and related tool are contained in the disk or the QR code, and the
actual packing shall prevail.
Dimension
Following figures are for reference only, the actual product shall prevail.
Model A (Unit: mm [in])
Summary of Contents for IR Eyeball
Page 1: ...IR Eyeball Network Camera Quick Start Guide V1 0 1 ZHEJIANG DAHUA VISION TECHNOLOGY CO LTD ...
Page 11: ...Quick Start Guide 5 Main interface ...
Page 15: ...Quick Start Guide 9 Cable going through the mounting surface ...
Page 17: ...Quick Start Guide 11 3 3 5 Adjusting Angle ...
Page 18: ...Quick Start Guide ...