54
- Organize the inlet and drain hoses using molding and hose guide.
※ Wipe and clean the attachment area
with a dry patch and attach the
molding and hose guide tightly.
15. Organize the inlet and drain hoses and power cord
- Connect 4 upper and lower bolts after mounting the body.
※ Check if there is any space on either side.
16. Mount the Body
The washing machine is recommended to be installed by a professional service engineer.
-
Follow the table below when drilling the tiles with tools.
Note
Wall type
Depth of Hole
Bit diameter of hammer drill
Bit diameter of tile hole
Hollow wall
Tile + 100mm
ø 14mm
ø 16mm
perforated wall
Concrete wall