31
22-
-55.. D
Drryyiinngg S
Seeqquueennccee
1) consist of drying sequence.
ex) select normal drying (Total spend time 2:30)
2) Drying Spin
① All course performance Max spin.
3) Crease Care
① Crease Care proceed 60 sec.
4) Electric Current Time of Dry Sequence.
5) Drying V/V working
① It work from the after 20sec, In Drying Sequence to End of Drying Sequence.
6) COOLING
① Fan motor and Main motor work at once during Cooling Sequence.
② Temp. of Drum is less than 50℃ finish Cooling Sequence.
③ Cooling time is total 5 min.
Drain(1min)
Drying(144min)
COOLING(5min)
End(10sec)
➞
➞
➞
➞
➞
➞
Crease Care(30min)
-> Not Displayed
➞
➞
Course
Normal
Whites
Steam Wash
Heavy Stain
Quick 30
Drying Spin
MAX
MAX
MAX
MAX
MAX
Etc
All course performance Max
spin.
Crease Care
Drying
COOLING Wrinkle Free
Time
Heater Off/On Temperture(℃)
Low
10/5
15/5
10/10
10/50
110
70/60
Low(Shoes)
10/5
2/30
2/30
X
36
70/60
Iron
10/5
15/5
10/10
10/50
60
105/95
Normal
10/5
15/5
10/10
10/50
150
105/95
Strong
10/5
15/5
10/10
10/50
200
105/95
Summary of Contents for DWD-T120R
Page 15: ...13 3 CABINET F ASSY ...
Page 17: ...15 4 CABINET ASSY ...
Page 19: ...17 5 BASE U AS ...
Page 21: ...19 6 TUB ASSY ...
Page 23: ...21 7 DUCT B AS DUCT PIPE AS G01 G02 ...
Page 68: ...64 1 Structure of BLDC Motor 7 HEATER BLDC MOTOR 2 Power Transmission System of BLDC Motor ...
Page 70: ...66 8 WIRINGDIAGRAM ...