Installation and Test Operation
FM0+ S6E1C-Series Starter Kit Guide, Doc. # 002-10542 Rev. *C
14
2.3.2 Test Procedure Explanation
This section explains the test procedure. This test procedure is based on the Serial Port Viewer.
User has to key-in the test procedure number displayed on the menu and then press the
Enter
key. The firmware on the board will run the test procedure and display the results. There are
eight test procedures and a brief description of each test procedure is given below:
UART (CMSIS DAP Port) Test:
This procedure will test the UART communication
between CMSIS-DAP and S6E1C3 MCU. Key in
0
and press the
Enter
key.
Figure 2-9: UART Test
Sub Clock Test
: This procedure will test whether the sub clock is at 32.768 KHz. Key in
1
and press the
Enter
key, the main routine will shift the system clock to sub clock, and
then shift back to main clock. It displays
OK
if the sub clock runs at 32.768 KHz,
otherwise it will display
Fail.
Figure 2-10: Sub Clock Test
Summary of Contents for FM0+ S6E1C-Series
Page 49: ...Appendix FM0 S6E1C Series Starter Kit Guide Doc 002 10542 Rev C 49 Figure A 2 CMSIS DAP USB...
Page 50: ...Appendix FM0 S6E1C Series Starter Kit Guide Doc 002 10542 Rev C 50 Figure A 3 Stereo Codec...
Page 51: ...Appendix FM0 S6E1C Series Starter Kit Guide Doc 002 10542 Rev C 51 Figure A 4 Interfaces...