background image

SMART APP ONLINE 

STEP-DOWN 

TRANSFORMER

OL5KSTF

INSTALLATION AND OPERATION MANUAL

©2021 Cyber Power Systems, Inc. All rights reserved.          K01-0000913-01

SAVE THESE INSTRUCTIONS 

Please read this manual and follow the instructions for installation and operation.

Summary of Contents for OL5KSTF

Page 1: ...TRANSFORMER OL5KSTF INSTALLATION AND OPERATION MANUAL 2021 Cyber Power Systems Inc All rights reserved K01 0000913 01 SAVE THESE INSTRUCTIONS Please read this manual and follow the instructions for i...

Page 2: ...ation contact your local recycling or hazardous waste facility Information advice help See applicable user manual SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS This manual contains important instruction...

Page 3: ...re conducting any maintenance repairs or shipment Installation environment should be in a temperature and humidity controlled indoor area free of conductive contaminants Do not install this step down...

Page 4: ...shock turn off and unplug the unit before installing the input output power cord with a ground wire Connect the ground wire prior to connecting the line wires Connect the Protection Earth PE safety c...

Page 5: ...ected equipment and only qualified maintenance personnel may carry out installations Wiring must be done by qualified personnel DO NOT USE FOR MEDICAL OR LIFE SUPPORT EQUIPMENT Under no circumstances...

Page 6: ...Rackmount Installation For 4 Post Rack 4 ELECTRICAL INSTALLATION 6 Hardwiring the Input Terminals 6 Connecting a Step Down Transformer to a UPS Power Module 8 TECHNICAL SPECIFICATIONS 9 PRODUCT REGIST...

Page 7: ...all handling operations including unpacking lifting and installation in a rack system Do not use the lifting straps to carry the unit around they are provided to manually unpack the unit only USE LIF...

Page 8: ...L5KSTF step down and isolation transformer 1 2 Left right hanging brackets 1 3 Left right rackmount rail 1 4 Input terminal block bottom cover 1 5 2U Rack mount ears Tower stands 2 ITEM CONTENT QTY 6...

Page 9: ...egment 1 Provides output overload and fault protection 5 Output Circuit Breaker 15A Max segment 2 Provides output overload and fault protection 6 4 x NEMA 5 20R Outlets 120Vac segment 2 Output recepta...

Page 10: ...n to 36 in 52 cm to 91 5 cm deep Select the proper holes in the rack for positioning the step down transformer in the rack The step down transformer takes up 2 rack units rack hole positions 1 through...

Page 11: ...DWARE INSTALLATION CONT RACKMOUNT INSTALLATION FOR 4 POST RACK CONT RACKMOUNT EARS INSTALLATION CONT RACKMOUNT INSTALLATION FOR 2 POST RACK This unit can be installed in a 2 post rack with an optional...

Page 12: ...30P POWER CORD CONNECTION Connect the NEMA L6 30P input power cord directly to an outlet on the UPS Refer to the CONNECTING A STEP DOWN TRANSFORMER TO A UPS POWER MODULE section in this user manual fo...

Page 13: ...STALLATION CONT 5 4 3 THE INPUT CONFIGURATION CONT 3 Secure the bottom section of the input terminal cover using the included screws 4 Insert the input cable through the appropriate cable gland not in...

Page 14: ...N CONT CONNECTING A STEP DOWN TRANSFORMER TO A UPS POWER MODULE The following illustrations provide the recommended connections between a step down transformer and a CyberPower Smart App Online UPS Sy...

Page 15: ...Vac Input connection type Power cord L6 30P Terminal Input Frequency 50 60 Hz Input Current Rating Power Cord 24A Terminal 27A OUTPUT Nominal Output Voltage 120 Vac UPS Outlets 12 NEMA 5 20R PHYSICAL...

Page 16: ...cyberpowersystems com registration to establish that you are the Initial Customer of the Product and therefore entitled coverage under the Limited Warranty and the Connected Equipment Guarantee Regis...

Page 17: ...ir respective owners 11 Cyber Power Systems Inc www CyberPowerSystems com For USA and Canada 4241 12th Ave East Suite 400 Shakopee MN 55379 Toll free 877 297 6937 For all other regions Please visit ou...