PUMP FLOW TEST SECTION 2 (See Figure 8J-12)
1. At the pump, remove the outlet line from pump
section 1. Plug line.
2. Install a tee to pump outlet port.
3. Connector flowmeter “IN” port line to the pump
tee. Cap remaining port of tee.
4. Install a 1/2-14 pipe to 7/8-14, 37° flare adapter
(Aeroquip #2021-8-10 or equivalent) in the
hydraulic tank fill port.
5. Connect the flowmeter “OUT” line to the adapter.
6. Completely open the flowmeter load valve.
7. Set the brake, start the engine and advance the
throttle to 3900 engine RPM.
8. Read/record no load flow. No load flow should be
4.0 gpm (15.14 lpm).
•
If flow is in specified range, proceed with Step 9.
•
If flow is lower than specified, engine RPM not
correct or pump is faulty.
9. Slowly close the flowmeter load valve until 1800
psi (12411 kPa) is obtained. Record flow.
10. Subtract flow in Step 9 from flow in Step 8.
Example:
4.0 gpm (15.14 lpm), Step 8 @ 3900 engine RPM
4.0 gpm (15.14 lpm), Step 9
0.0 gpm (0.0 lpm) leakage
•
If leakage is 1/2 gpm (1.89 lpm) or less, pump is
okay, proceed with Step 11.
•
If leakage is 1/2 to 1-1/2 gpm (1.89 to 3.78 lpm),
the pump is marginal.
•
More than 1-1/2 gpm (3.78 lpm) leakage will
noticeably reduce performance. The pump may
have to be repaired or replaced (Section 8D).
11. Continue closing flowmeter load valve until flow
drops off and pressure stays constant.
•
Relief set at 2000 psi ± 10% (12411 to 15169
kPa), relief is okay, proceed with Step 12.
•
Relief does not open in specified range, pro-
ceed with Step “a” below.
a. Remove the acorn nut from side of valve.
b. Turn screw 1/8 turn, clockwise (CW) increases
pressure or counterclockwise (CCW) to
decrease pressure. Replace acorn nut.
c. Set the brake, start the engine and advance
the throttle to 3900 engine RPM.
d. Push lift valve lever forward into the lower posi-
tion and hold.
e. Slowly close the flowmeter load valve until
1800 psi (2441 N.m) is obtained, read/record
flow.
•
Relief should be set at 2000 psi ± 10%
(12411 to 15169 kPa). Repeat Steps 11a
and 11b above until correct pressure is
obtained.
•
If pressure can not be obtained, valve may
be faulty, replace.
12. Open tester load valve and shut down engine.
TOP SELECTOR VALVE TEST
(See Figure 8J-13)
NOTE
A pump test should be performed before pro-
ceeding with a selector valve test.
13. Reconnect pump section 1 outlet line to tee.
14. At connection manifold, disconnect line 8 from
port 7.
15. Put high/low speed selector lever in low.
16. Pull selector valve knob up.
17. Completely open the flowmeter load valve.
18. Set the brake, start the engine and advance the
throttle to 3900 engine RPM.
19. Slowly close the flowmeter load valve until 1800
psi (12411 kPa) is obtained. Record flow.
20. Subtract flow in Step 19 from flow in Step 9.
Example:
5.0 gpm (18.93 lpm), Step 9 @ 3900 engine RPM
4.5 gpm (17.04 lpm), Step 19
0.5 gpm (1.89 lpm) leakage
•
If leakage is 1/2 gpm (1.89 lpm) or less, pump is
okay, proceed with Step 21.
•
If leakage is 1/2 to 1 gpm (1.89 to 3.78 lpm), the
pump is marginal.
•
More than 1 gpm (3.78 lpm) leakage will notice-
ably reduce performance. The valve may have
to be replaced.
21. Open tester load valve and shut down engine.
HYDRAULICS
SECTION 8J. INSTRUMENT TEST
8J-19
8J
!
CAUTION
DO NOT exceed 2500 psi (17237 kPa) during
this test.
Summary of Contents for TURF-TRUCKSTER
Page 31: ...ENGINE SECTION 3D DIESEL ENGINE 3D 3 3D Figure 3D 2 Radiator and Cooling System Repair...
Page 54: ...DRIVE TRAIN SECTION 4C DRIVE SHAFT 4C 3 4C Figure 4C 3 Drive Shaft Disassembly and Reassembly...
Page 102: ...DRIVE TRAIN SECTION 4I REAR AXLE 4I 4 Figure 4I 4 Axles and Axle Housings...
Page 107: ...DRIVE TRAIN SECTION 4I REAR AXLE 4I 9 4I Figure 4I 11 Auxiliary Transmission Disassembly...
Page 110: ...DRIVE TRAIN SECTION 4I REAR AXLE 4I 12 Figure 4I 13 Auxiliary Transmission Reassembly...
Page 124: ...BRAKE SYSTEM SECTION 5E MASTER CYLINDER 5E 2 Figure 5E 2 Master Cylinder Connections...
Page 131: ...STEERING SECTION 6C STEERING SYSTEM 6C 4 Figure 6C 4 Steering Column...
Page 137: ...STEERING SECTION 6D STEERING GEAR 6D 4 Figure 6D 5 Rack Piston...
Page 143: ...STEERING SECTION 6E STEERING PUMP 6E 2 Figure 6E 2 Steering Pump Repair...
Page 163: ...HYDRAULICS SECTION 8G BOX CYLINDER 8G 2 Figure 8G 2 Seal Kit Installation...
Page 170: ...HYDRAULICS SECTION 8J INSTRUMENT TEST 8J 5 8J Figure 8J 3 Selector Valve Test Steps 13 to 20...
Page 171: ...HYDRAULICS SECTION 8J INSTRUMENT TEST 8J 6 Figure 8J 4 Selector Valve Test Steps 21 to 29...
Page 173: ...HYDRAULICS SECTION 8J INSTRUMENT TEST 8J 8 Figure 8J 5 Lift Valve Test Steps 30 to 36...
Page 174: ...HYDRAULICS SECTION 8J INSTRUMENT TEST 8J 9 8J Figure 8J 6 Lift Valve Test Steps 37 to 41...
Page 176: ...HYDRAULICS SECTION 8J INSTRUMENT TEST 8J 11 8J Figure 8J 7 Cylinder Test...
Page 178: ...HYDRAULICS SECTION 8J INSTRUMENT TEST 8J 13 8J Figure 8J 8 Pump Section 1 Flow Test...
Page 179: ...HYDRAULICS SECTION 8J INSTRUMENT TEST Figure 8J 9 Bottom Selector Valve Test 8J 14...
Page 181: ...HYDRAULICS SECTION 8J INSTRUMENT TEST 8J 16 Figure 8J 10 Lift Valve Test...
Page 183: ...HYDRAULICS SECTION 8J INSTRUMENT TEST 8J 18 Figure 8J 11 Cylinder Test...
Page 185: ...HYDRAULICS SECTION 8J INSTRUMENT TEST 8J 20 Figure 8J 12 Pump Section 2 Flow Test...
Page 186: ...HYDRAULICS SECTION 8J INSTRUMENT TEST 8J 21 8J Figure 8J 13 Bottom Selector Test...
Page 251: ...ATTACHMENTS SECTION 12C MECHANICAL PTO 12C 2 Figure 12C 3 Mechanical PTO Exploded View...
Page 259: ...MISCELLANEOUS SECTION 14A PRECAUTION DECAL LOCATIONS 14A 1 14A PRECAUTION DECAL LOCATIONS...
Page 261: ...MISCELLANEOUS SECTION 14B CONVERSION CHARTS 14B 1 14B MILLIMETERS TO DECIMALS...