5
Expansion Box and Virtual
Expansion Box Installation
Topics Covered in this Chapter
Preparing the Enclosures for Installation
Installing the Plug-In Modules
Installing the EDGE Variable Output
Installing the EDGE 4IN-2V-8DO Before Wiring
DC Network and Power Supply Redundancy
Connecting a Module to the Communication Network
Connecting a Variable 0-10 VDC Output
Connecting an EDGE Variable Output module (SSR)
Connecting an AC Power Source for Light Dimmer Output
Connecting Light Dimmer Output
Connecting the Current Sensors of Discrete Outputs
Preparing the Enclosures for Installation
Preparing the equipment before mounting it to the wall facilitates manipulation and ensures all parts are
ready to be installed.
Before You Begin
The following figures illustrate how to install the wires in the plastic enclosure. Wires are separated into
two groups: low voltage and high voltage.
NOTE:
The use of rigid conduits up to 2 inches (50.8 mm) is allowed for the EDGE 3-Slot Expansion Box
and the EDGE 6-Slot Expansion Box.
890–00687
EDGE 2
59
Summary of Contents for 064-11343
Page 7: ...Chapter 1 Introduction Figure 1 2 Enclosure Identification 890 00687 EDGE 2 7...
Page 22: ...NOTES 22 890 00687 EDGE 2...
Page 30: ...Chapter 2 Pre Installation Planning 30 890 00687 EDGE 2...
Page 40: ...NOTES 40 890 00687 EDGE 2...
Page 58: ...NOTES 58 890 00687 EDGE 2...
Page 98: ...NOTES 98 890 00687 EDGE 2...
Page 112: ...NOTES 112 890 00687 EDGE 2...
Page 116: ...NOTES 116 890 00687 EDGE 2...
Page 120: ...NOTES 120 890 00687 EDGE 2...
Page 134: ...NOTES 134 890 00687 EDGE 2...
Page 135: ...F Extending a cable Best practice using a junction box 890 00687 EDGE 2 135...
Page 136: ...Appendix F Extending a cable Using of heat shrink tubing 136 890 00687 EDGE 2...