88
Culligan® Premier Series Automatic Deionizer
88
Cat. No. 01024000
Programming an External Quality Monitor
2)MANUAL REGEN
3)SET DATE/TIME
4)ADV. SETUP
>5)ACCESSORIES
1. From the main menu screen, press
to 5)ACCESSORIES.
2. Press
. The screen displays the Accessories menu.
>1)TDS
2)FLOW METER
3. Press
to select 1)TDS
.
The screen displays the TDS Setup settings.
TDS SETUP
>TDS EXTERNAL
4. The default configuration is a standard TDS probe measurement. To use the op-
tional TDS quality sensor, press
and
or
to change the setting to TDS
EXTERNAL.
NOTE If the TDS drops below the limit before MIN CAPACITY (GALS) is reached, a PURGE will occur. If
quality does not rise above the limit, a regeneration will be triggered. If MIN CAPACITY is set to zero,
the unit will trigger a regeneration immediately upon falling below the limit.
Testing the External Quality Monitor Operation
1. Turn on the control and adjust the set point to 20 uS/cm (50,000 ohms).
2. Make sure the #5 jumper has been removed from the rear of the monitor.
3. Turn the OFF/AUTO/ON switch to the AUTO position.
4. Immerse the probe in the solution to be monitored, and press the MEAS button (if necessary). The LCD will
show the uS/cm value of the liquid. The LED indicator will light up Green when the meter is in measurement
mode and #3 (Dosing contact) is open, but will light up Orange/Yellow when #3 (Dosing contact) is closed.
5. A regeneration will be initiated when the contact is closed. To prevent this, temporarily remove one of the wires
on the #3 (Dosing Contact) terminals.
External Quality Monitor Calibration
1. The meter should be in the measure mode.
2. Immerse the probe in the calibration solution HI 7033 (this solution is 84.0 uS/cm).
3. Shake briefly and wait for reading to stabilize.
4. Adjust the CAL trimmer pot to read 84.0 uS on the LCD display.
NOTE The meter was calibrated at the factory prior to shipment.