Cubis stakkabox Installation Manual Download Page 1

INSTALLATION GUIDE

STAKKAbox™ Range

General guide

www.

cubis-systems

.com

+44 (0)28 38 313 100

[email protected]

Summary of Contents for stakkabox

Page 1: ...INSTALLATION GUIDE STAKKAbox Range General guide www cubis systems com 44 0 28 38 313 100 techsupport cubisindustries com ...

Page 2: ...h laws regulations codes or orders of such authorities the customer shall be responsible for the violations thereof and shall bear the costs expense and damages attributable to its failure to comply with the provisions of such laws ordinances rules regulations codes or orders Reproduction of the material herein is not permitted without the written consent of CUBIS Industries NOTES ON APPLICATION T...

Page 3: ... the correct loading as dictated by European standards or any other relevant authority CUBIS Industries manufacture a range of covers and frames engineered to work in conjunction with its chambers Covers and frames that are not supplied by CUBIS should be agreed to be fit for purpose prior to installation as this might adversely affect the quality of the installation HEALTH AND SAFETY In areas whe...

Page 4: ...m ring section is now carefully positioned on the base If the chamber system does not have a preformed base then the ring should be gently tapped so that it beds down into the base by approximately 10mm The correct orientation of the chamber ring is with the horizontal lip to the bottom Check that the ring is level and at the correct depth If a concrete base is being used the concrete can be float...

Page 5: ...xisting duct 8 3 In both cases it is important that a complete ring is installed either side of the cut ring section Wall Furniture Security Systems 9 Wall furniture can be installed at this stage if not already factory fitted 9 1 Mark the position of the furniture as required by the clients specification on the chamber walls drill 11mm holes and fix the furniture with the bolts supplied 9 2 If us...

Page 6: ...ound of the chamber can now take place Backfilling is formed in layers and should be completed to the top of the chamber or in the case of a roadway construction to the underside of the blacktop construction Refer to Table 1 for the recommended backfill material and required width of material Refer to Specification for the Reinstatement of Openings in Highways Appendix A8 for the depth of layers a...

Page 7: ...ate 13 2 Remove the frame and apply the mortar bed This should be approximately 10mm higher than required and 25mm greater than the spread of the underside of the frame 13 3 Carefully position the frame on to the mortar bed taking care that the inside faces of the frame line up with the edges of the chamber If using a rising frame this should happen automatically 13 4 Gently tap the frame into the...

Page 8: ...compacted thickness up to for compacted thickness up to 100mm1 50mm 200mm1 00mm1 50mm 200mm Vibrotamper 50 kg minimum 48 N P4 8N P Single Drum 1000 2000 kg m 8 NP NP 6N PN P 2000 3500 kg m 36N P3 57 Over 3500 kg m 346 346 Twin Drum 600 1000 kg m NP NP NP 6N PN P 1000 2000 kg m 48N P 36N P Over 2000 kg m 235 234 1400 1800 kg m2 N PN PN P5 NP NP Over 1800 kg m2 36N P3 57 Notes 1 2 3 4 Vibrotamper 25...

Page 9: ...0mm of compacted stone MOT1 Bracing required on chambers with side wall lengths greater than 600mm Compacted MOT1 stone or lean mix concrete 3 C250 1200 150mm or width of compacting equipment 150mm of lean mix concrete C40 Bracing required on chambers with side wall lengths greater than 600mm Minimum 150mm C40 concrete 4 D400 2000 200mm or width of compacting equipment 150mm of lean mix concrete C...

Page 10: ...10 DIAGRAM 1 ...

Page 11: ...11 DIAGRAM 2 Typical detail of a hard shoulder showing the location of some installation groups ...

Page 12: ...ntact us Head Office 4 Silverwood Industrial Estate Lurgan Co Armagh BT66 6LN Northern Ireland Telephone 44 0 28 38 313 100 Email techsupport cubisindustries com Web www cubis systems com v 1 3 01 02 2016 ...