
5
GG-R
Installation Guidelines:
• Always mount the sensor vertically.
• Must be easily accessible for calibration and
maintenance.
• Mount the sensor close to the potential leak source.
• For optimum leak detection, mount sensor 1’ – 2’
above floor.
• Take air movement and ventilation patterns into
account.
• To prevent electrical interference, keep sensor and
wire runs away from mercury vapor lights, variable
speed drives, and radio repeaters.
• Protect sensor from physical damage(forklifts, etc.).
• If mounting on a wall with studs, the mounting
screws should be screwed into the studs.
• Mount sensor enclosures through the mounting
holes as shown in Figure 1. Use the supplied
self-tapping screws for mounting on sheet metal
surfaces.
• Even though the sensor comes calibrated from
the factory, it is always a good idea to calibrate the
sensor to the environment in which it is installed.
This will compensate for any inaccuracies caused by
difference in temperature, altitude, etc.
2.0"
6.5"
6.8"
7.75"
Figure 1: Mounting Dimensions