background image

4

Product Dimensions

Measurement

Location Card

Two-pin MIL

Output Connector

Switch

Quick

Connect

Option

Screw

Terminal

Option

Optional Online

Expansion Jack

Input Terminal Strip Options

BNC

Output

Connector

Figure 1. Dimensions

Figure 2. Diagram

Front View

Side View

Summary of Contents for SB282 Series

Page 1: ...SB282 Series SB282 Series Dual Output Switch Box Dual Output Switch Box 4 8 Channel 4 8 Channel Product Manual Product Manual ...

Page 2: ...duct Description 3 Product Dimensions Diagram 4 Mounting Instructions 5 Conduit Entry 6 Grounding 7 Installation of Sensor Signal Input Cable 8 Post Installation Testing 13 Warranty Return Information 15 Table of Contents ...

Page 3: ... terminal block includes input for signal temperature common and shield The shield drain wire is earth grounded via a ground stud that is mounted to the side of the stainless steel enclosure Optionally the SB282 can be equipped with a multi pin connector for interface with online systems for continuous live readings This connection requires a JB905 1A or 2A plug A centrally located switch on the e...

Page 4: ...t Location Card Two pin MIL Output Connector Switch Quick Connect Option Screw Terminal Option Optional Online Expansion Jack Input Terminal Strip Options BNC Output Connector Figure 1 Dimensions Figure 2 Diagram Front View Side View ...

Page 5: ...re supplied with integral mounting brackets attached Note If you have purchased a switch box without cable entries provided you should add your own entry prior to mounting the enclosure Mounting Holes 0 31 in 7 95 mm Figure 3 Mounting Bracket Placement ...

Page 6: ...ble entry enters from the bottom of the enclosure when mounted Note To ensure moisture will not flow into the enclosure a hole should be drilled at the lowest point in the conduit to provide drainage for any moisture Correct Figure 4 Conduit Entry for Switch Box Drill Drain Hole Here ...

Page 7: ... ground A Mounting to Earth Ground When mounting SB282 Series Switch boxes to earth ground such as an I Beam no additional steps are necessary as the enclosure is grounded internally to the stainless steel enclosure See Figure 5 below Figure 5 Switch Box SB282 Earth Ground ...

Page 8: ...h ground Figure 6 Ground Wire Placement Sensor Installation Installation of sensors signal input cable 1 Feed blunt end through the cable entry at the bottom of the enclosure Note it is recommended that cables are marked on both ends For cord grip cable entry take off the cord grip cover with bushing and run cable into enclosure hand tighten cord grip cover to base to prevent damage of cord grip ...

Page 9: ...ure 9 Stripped Wire Shield Drain wire 4 Locate the appropriate plug identified by channel number remove it and install the wires using a small flathead screwdriver Depress selected position button to open terminal for respective wire Push plug back into location Refer to the below chart for the correct orientation based on application Figure 8 Bottom View Figure 7 Front View ...

Page 10: ...ctor cables such as CB105 CB117 CB119 CB192 CB218 CB618 CB818 or CB819 for biaxial applications If using a 3 conductor cable such as CB112 CB191 CB212 CB512 CB612 or CB812 substitue the red wire for green Table 1 Wiring Instructions for Various Applications LP400 SERIES DYNAMIC 4 20 mA VIBRATION SOCKET A WHITE WIRE VIBRATION SOCKET B BLACK WIRE COMMON SOCKET C RED WIRE 4 20 mA SOCKET GND SHIELD DR...

Page 11: ... at the switch box while Person B will be located at the measurement location 2 Once positioned Person A will connect the TM1018 to the data collector output to the switch box and turn the Channel Selector to the channel that corresponds to the referenced measurement Person A should observe a NORMAL LED reading 3 PersonBdisconnectsthecablefromtheaccelerometer andtheTM1018should respond with an OPE...

Page 12: ...eter 2 Yellow LED Open Circuit Indicates one of the following a Cable connector is not connected to accelerometer b Cable is open circuit broken or not connected one end c Accelerometer is not functioning correctly 3 Red LED Short Circuit Indicates one of the following a Water or contamination in the connector b Reverse Wiring and leads are reversed c Wires in switch box or cable connector are tou...

Page 13: ...ew condition within 90 days of shipment Build to order products qualify for a 50 refund if returned in new condition within 90 days of shipment Custom products are quoted and built specifically to the requirements of the customer which may include completely custom product designs or private labeled versions of standard products for OEM customers Custom products ordered are non cancellable non ret...

Reviews: