Page 6 of 15
System Installation
Open box and check components.
Mount system to wall or stable surface ensuring there is enough room to insert/replace
quartz sleeve and lamp.
Unscrew end nuts. Wearing gloves, clean quartz sleeve with methylated spirits and a clean
cloth (if needed). Slide quartz sleeve into chamber, ensuring sleeve is evenly distributed on
both ends. Slide on o-rings then secure sleeve with nuts. DO NOT OVERTIGHTEN as this
could damage the sleeve and/or o-ring.
Make sure water supply is turned off.
Connect fittings (fittings dependent on customer’s requirements – not included with system)
to inlet and outlet ports of the unit. Connect fittings into water line or onto a water filter
system.
Open water supply to the unit and open faucet. Once water is pouring out of the faucet, turn
faucet off to allow pressure to build up in system. CHECK FOR LEAKS!
Turn water supply off and drain unit.
Unscrew
Discard
Fitting
Fitting
Unscrew