WS010122 - Boston Vanity Unit

Tools required - not supplied

Pencil;Tape Measure; Philips Screwdriver; Flat Head Screwdriver; Mallet; Drill; 5mm Drill Bit;    

8mm Drill Bit (Ceramic drill bit optional).

KEEP DIY TOOLS OUT OF THE REACH OF CHILDREN

Home Safety Advice

- It is recommended that two people fit this product to ensure that it is fitted safely.

- Always take care when using power tools, particularly in the bathroom.

- Always check for hidden cables and pipework before drilling and take extreme care if there is any             

  water in the working area.

- It is advisable to use a residual current circuit breaker (RCCB).

- Always wear suitable eye protection when drilling. 

- If the product is to be fitted on a ceramic tiled wall, a ceramic drill bit should be used.

- Always ensure that the drill hole passes through the central tiled area rather than through the grouted   

  area. To prevent damage to the tile, mask the area around the hole with tape before drilling.

- Do not strike the product with hard or sharp objects.

Product Care

To retain the best quality finish, clean product regularly with a soft damp cloth.

Do not use abrasive or chemical cleaners as these will damage the product.

Product Location

Vanity units are only as strong as the wall to which they are fixed and the fixings that are used.

For different wall types you will need to ensure that you are using the correct type of fixing for the material 

of the wall.

The addition of backboards on the outside of the wall or appropriate strengthening of internal structures 

may be required to provide adequate wall strength.

Maximum working load for vanity unit is 100kg when fixed to a solid wall. 

NOTE: If the wall is made of lightweight thermal blocks, aerated hollow brickwork or prefabricated  

partitions even the most appropriate fixings may not be able to withstand the loads which can be 

suddenly applied to the vanity unit. 

CAB 096 R01

All manuals and user guides at all-guides.com

Summary of Contents for Boston WS010122

Page 1: ...eramic drill bit should be used Always ensure that the drill hole passes through the central tiled area rather than through the grouted area To prevent damage to the tile mask the area around the hole with tape before drilling Do not strike the product with hard or sharp objects Product Care To retain the best quality finish clean product regularly with a soft damp cloth Do not use abrasive or che...

Page 2: ...ont P009 x 1 J Top Drawer Panel P010 x 1 K Draw Side Panel P011 x 2 L Top Draw Base P012 x 1 M Top Draw Front P013 x 1 N Lower Draw Side Panel P014 x 1 O Lower Draw Side Panel P015 x 1 R Support Brace P018 x 2 A Glue Pack H001 x 1 B Cam Lock Pin H002 x 2 E Countersink Screw H005 x 8 F Runner screw H006 x 4 C Cam Lock H003 x 2 D Dowel H004 x 4 P Concealed Runner P016 x 1 Q Concealed Runner P017 x 1...

Page 3: ...ty Unit Side Panel P003 x 1 P Concealed Runner P016 x 2 Q Concealed Runner P017 x 2 E Countersink Screw H004 x 4 E Countersink Screw H004 x 4 Installation Step 2 Click A Vanity Unit Base P001 x 1 B Vanity Unit Side Panel P002 x 1 All manuals and user guides at all guides com ...

Page 4: ...CAB 096 R01 4 Installation Step 3 Click C Vanity Unit Side Panel P003 x 1 All manuals and user guides at all guides com ...

Page 5: ...l with Hanging Baton P006 x 1 D Rear Panel P004 x 1 D Rear Panel P004 x 1 E Front Panel P005 x 1 F Rear Top Panel with Hanging Baton P006 x 1 D Rear Panel P004 x 1 E Front Panel P005 x 1 F Rear Top Panel with Hanging Baton P006 x 1 Click Click A B All manuals and user guides at all guides com ...

Page 6: ...k N Lower Draw Side Panel P015 x 1 G Lower Draw Panel P007 x 1 D Dowel H004 x 4 H Lower Draw Base P008 x 1 A Glue Pack H001 x 1 B Cam Lock Pin H002 x 2 I Lower Draw Front P009 x 1 A Glue Pack H001 x 1 O Lower Draw Side Panel P014 x 1 All manuals and user guides at all guides com ...

Page 7: ...nstallation Step 9 Installation Step 10A CAB 096 R01 7 I Lower Draw Front P009 x 1 C Cam Lock H003 x 2 J Top Drawer Panel P010 x 1 K Draw Side Panel P011 x 2 All manuals and user guides at all guides com ...

Page 8: ...p 10B Installation Step 11 Installation Step 12 CAB 096 R01 8 A B Click J Top Drawer Panel P010 x 1 K Draw Side Panel P011 x 2 A Glue Pack H001 x 1 L Top Draw Base P012 x 1 All manuals and user guides at all guides com ...

Page 9: ...Installation Step 14 Installation Step 15 CAB 096 R01 9 Click A B M Top Draw Front P013 x 1 Q Support Brace P018 x 2 I Support Brace Screws H008 x 4 E Countersink Screw H005 x 4 All manuals and user guides at all guides com ...

Page 10: ...l the Hang N Lock bracket Please use either supplied Assemble the Hang N Lock bracket sections making sure all parts are slotted tightly together Image for reference only Determine the desired location for the vanity unit Place the Hang N Lock bracket underneath the panel at the rear of the vanity unit With a pencil mark through the screw hole positions in each cam recess and draw a reference line...

Page 11: ...les through the support braces Insert wall plugs and re hang the vanity unit in position aligning the holes in the support braces Using a philips screwdriver screw through the braces to reinforce the vanity unit on the wall surface Hang the vanity unit onto the Hang N Lock bracket checking the unit is level Using a pencil mark through the support braces and remove the vanity unit IMPORTANT The sup...

Page 12: ...ems in the Croydex range please visit our website www croydex com Croydex Ltd Central Way Andover Hants SP10 5AW UK Tel 44 0 1264 365881 Fax 44 0 1264 356437 Email info croydex co uk _ 3 A B C D H Runner Screws H008 x 4 All manuals and user guides at all guides com ...

Reviews: