background image

Boiling Water Units 

 

Features: 

 

Automatic filling. 

 

Electronically controlled. 

 

Economical to use. 

 

Serviced without                     
removing the tap. 

 

Boil dry protected             
element. 

 

Steam free operation. 

 

Available in white or stain-
less steel cover. 

OPERATING  & INSTALLATION INSTRUCTIONS 

CELSIUS 100 BOILING WATER UNITS 

MODELS: CRN2.5, CRN5, CRN7.5,CRN10, CRN15, CRN20, CRN25 CI & EI 

Crown Celsius 100 

    

PROUDLY MADE IN AUSTRALIA 

Summary of Contents for CRN2.5

Page 1: ...erviced without removing the tap Boil dry protected element Steam free operation Available in white or stain less steel cover OPERATING INSTALLATION INSTRUCTIONS CELSIUS 100 BOILING WATER UNITS MODELS CRN2 5 CRN5 CRN7 5 CRN10 CRN15 CRN20 CRN25 CI EI Crown Celsius 100 PROUDLY MADE IN AUSTRALIA ...

Page 2: ...oduct order form All models are supplied as White powder coated finish unless Stainless Steel is specified WARRANTY 12 Months Parts and Labor against system failure M O D E L NO C A P A C I T Y LTS NO CUPS C U P H R RECOVERY RATING KW AMP HEIGHT WIDTH DEPTH CRN 2 5 2 5 14 110 1 8 10amp 365 320 220 CRN 5 5 25 110 1 8 10amp 465 320 220 CRN 7 5 7 5 38 110 2 4 10amp 480 350 250 CRN 10 10 50 110 2 4 10...

Page 3: ...er to all boiling water units which are being installed in hard water areas especially W A S A N T and parts of Q L D and N S W as some of these areas have a high concentrate of minerals and iron oxide in the wa ter which are very harmful to the holding tanks etc Failure to fit adequate filters will void the warranty of the product Service If this boiling water unit requires service of any kind ju...

Page 4: ...IONS Once the unit has been installed correctly the following procedure should take place 1 Turn water on 2 Turn power on 3 Wait until water reaches the minimum water level probe usually a dribble will come out of the tap in the open position 4 Close the tap and while the unit is filling observe to see that there are no leaks of water if so investigate the reason why and repair 5 Once the maximum ...

Page 5: ...LOWING OR OVER BOILING REPLACE VENT THERMOSTAT IF UNIT OVER BOILING REPLACE THERMISTOR IF PROBLEM PERSISTS REPLACE CIRCUIT BOARD UNIT NOT GIVING WATER FROM THE TAP TAP BROKEN WATER NOT TURNED ON ELECTRIC INLET VALVE COIL BURNED OUT CIRCUIT BOARD FAULTY REPLACE TAP INSERT TURN WATER ON AND TEST UNIT REPLACE WATER INLET VALVE AND TEST UNIT REPLACE CIRCUIT BOARD AND TEST UNIT UNIT NOT WORKING PROPERL...

Page 6: ... the clamp plate and ele ment so everything lines up on the assembly procedure Undo the six clamp plate nuts evenly until they are all nearly undone then place one hand inside the tank and hold the element while removing all the nuts and washers and clamp plate then withdraw the element out through the top Installation of the new element is the reverse of the dismantling procedure only make sure t...

Page 7: ...esting Procedure Tighten drain cock close tap turn water on and turn power on unit should start up and fill with water until top probe is reached then unit will start heating depending on size and litres once the water has reached serving temperature the ready light will come on and stay on for up to 10 minutes then when it settles down the unit will operate by power on for a few seconds then off ...

Page 8: ...NDUSTRIES FACTORY 47 70 72 CAVE HILL ROAD LILYDALE VIC TORIA AUSTRALIA 3140 Phone 61 3 9739 6966 Fax 61 3 9769 6977 ELECTRICAL REPAIRS TO BE PERFORMED BY A QUALIFIED PERSON ONLY Wiring diagram for Celsius 100 ...

Reviews: