Operation Instructions
Chapter 4: Offloading, Unboxing and Installing
—————————————————————————————————
4.1On-site conditions during offload handling
Customer needs to provide handling equipment and tools to ensure the safe handling of the machine to
the installation site.In the meantime, CRON engineers will assist with the handling and uncrating on site.
4.2Shipment packing
A High-precision Digital flexoImagerunit is usually packed in a wooden crate box for easy shipping and
handling. The following table lists the package sizes and weight of different models of HDI.
Table 4.1: Packing size and weight
Device Model
W(cm)
L(cm)
H(cm)
Weight(kg)
HDI-600**
170
136
140
850
HDI-920**
190
150
137
950
HDI-1600**
260
170
147
1600
4.3 Loading &unloading equipment
Customers must provide forklift or crane with minimum load-bearing for more than 2000kg. Forks length
must be more than 150cm. If necessary, lengthen the span of two forks according to the wooden box and
the structure of the machine to adjust to the corresponding width.
Picture 4-1: Forklift
4.4 Installation personnel
CRON advised customer to provide professional handling personnel to move the machine to the premises
of installation and unpack the crate, with CRON professionals work together on site.