![Crestron UPX-2 Operation Manual Download Page 16](http://html.mh-extra.com/html/crestron/upx-2/upx-2_operation-manual_2683681016.webp)
Crestron
UPX-2
Universal Presentation Processor
Download the Required Files from Crestron
The 2-Series control system must contain the correct .CUZ firmware file. These files
are located on the Crestron website.
On the Crestron website, browse to
Tools & Resources| Product Resources |
Software & Firmware Updates
and select the appropriate file for the 2-Series
control system that is to be connected to the UPX-2. Files are also available on the
FTP site.
You must use the following software versions to program the control system and the
UPX-2. These programs are available from the Crestron website.
•
SIMPL™ Windows
®
version 2.06.20 or later with Library Update 320 or
later. Requires SIMPL+
®
Cross Compiler version 1.1 or later.
•
Crestron Database version 17.4.4 or later. Required by SIMPL Windows.
•
Crestron VisionTools
®
Pro-e version 3.3 or later. Used for graphical
touchpanel design.
•
Crestron Toolbox version 1.2.10 or later. Used for observing system
processes, uploading operating systems and firmware, uploading programs
and UPX-2 projects, and many other tasks.
Load the Demo Program & Project
For the demo program to function the UPX-2 must contain the correct .VTZ project
file and the control system it is connected with must contain the correct .SPZ file.
These files are contained in a ZIP file on the Crestron FTP server. The FTP server
contains a ZIP file for systems with a DTT-15V2 touchpanel and a ZIP file for
systems with a DTT-17 touchpanel.
To access the FTP site, go to the Crestron website and select
Tools & Resources |
FTP Servers
. Log in to the FTP server with your website login and password.
1. Navigate to the “specific_products” subdirectory of the “demos” directory.
2. Select the appropriate file for your system.
–
upx_15_inch_demo_rev_XXX.zip
for the DTT-15V2
–
upx_17_inch_demo_rev_XXX.zip
for the DTT-17.
3. Unzip the file and open Crestron Toolbox to transfer the .VTZ project file
directly to the UPX-2.
NOTE:
Crestron recommends sending the project files to the UPX-2 via
Ethernet, the fastest method. Crestron also recommends reviewing the
UPX-2 FAQs that are available through the
Online Help
on the Crestron
website.
4. Select
Tools | System Info
.
xiv
¥
Universal Presentation Processor: UPX-2
Operations Guide – DOC. 6276B