![Crestron AV2 Operation Manual Download Page 26](http://html1.mh-extra.com/html/crestron/av2/av2_operation-manual_2683828026.webp)
2-Series Integrated Dual Bus Control System
Crestron
AV2 & PRO2
c. Set the baud rate of the AV2/PRO2 control system to 115200, as
follows:
-
Press and release the
HWR
button on the unit’s front panel.
-
Press and hold the
SWR
button for approximately three to five
seconds. The Viewport console should display the following
message:
Viewport Message
- Release
the
SWR
button.
d. If communication still cannot be established:
-
Remove power from the control system.
-
Press and hold the
SWR
button on the front panel of the
AV2/PRO2.
-
Reapply power to the control system.
-
The Viewport console should display the message shown
above.
- Release
the
SWR
button.
e. Select
Set Baud Rate
on the Viewport
Functions
menu (or press
F8
) and choose any baud rate from the drop-down list. This will
attempt to establish a connection at the indicated baud rate. If the
connection is successful, both the PC and the control system will
be set to the new baud rate.
f. Reinitialize the unit by recycling the power or pressing the
HWR
button. If the connection is established, the Viewport console
should display some text and the
<AV2>
or
<
PRO2>
prompt.
g. If communication still cannot be established, contact Crestron
customer service.
Compiling and Uploading a Program to the Control
System
After you have completed your SIMPL Windows program you must compile and
upload the program to the control system.
To compile the program, simply click the
Convert/Compile
button
on the
SIMPL Windows toolbar, or select
Project | Convert/Compile
(you can also press
F12
). A status bar will indicate the progress of the compile operation. After the
operation is complete, a window will display information about the program such as
the number and type of signals, and memory usage.
The compiled program will be stored as an SPZ file in the same directory as the
source file. There are a number of ways to upload an SPZ file to the control system.
1. Immediately after compiling the program you have the option to transfer
the file to the control system.
22
•
Integrated Dual Bus Control System: AV2 & PRO2
Operations Guide - DOC. 5957A