DMS-R-IM
Safety
April 7, 2021
Digital Modular System - Rinse
1-20
1.13
Lockout Tag out (LOTO)
Electrical Hazard:
Hazardous voltage. May cause electrical
shock or burn. Refer to electrical drawing for more detail.
Disconnect and lockout tag-out system. Wait for
at least 15
minutes
after main supply is disconnected prior to servicing
this system.
WARNING
Please read through this
Safety
section before carrying out
installation, operation or maintenance of this system.
In accordance with the OSHA Standard 1910.147, this system must be locked
out prior to servicing. Lockout procedures are posted in the operating area
and/or by the main energy source of the system.
The system is powered by
240VAC, 3-phase, 60Hz
for system and
has
compressed air, detergent and DI water supply. All have to be isolated prior to
servicing. Refer to plumbing and electrical drawings for more detail.
If you have any questions about the lockout procedures, please see your
supervisor or Safety Director.
1.13.1
Lockout Tag out Procedure
Step
Description
1
Inform operator / supervisor about work to be performed. Ensure
that approval has been obtained.
2
End current process.
3
Press the
[EMO]
button to power down the system.