
Hostname
is the cabinet, system, or partition ID; examples include
c0-0
(for a cabinet),
S0
(for a
system), or
p0
(for a partition).
4.3
Spring Returned Preconditioner Water Valve Actuator
Replacement
4.3.1
Remove a Spring Returned Preconditioner Water Valve Actuator
Prerequisites
Tools Required:
Diagonal cutter
Tie straps
Balldriver Set, 11 Piece 5/64-3/8in
Phillips screwdriver
Time Required:
15 minutes
About this task
CAUTION:
●
Equipment damage
●
It's recommended to perform this procedure on a powered down cabinet. If performed on a powered
up cabinet, the procedure must be completed within 15-20 minutes to prevent possible system EPO
and/or condensation.
CAUTION:
●
Equipment damage
●
This procedure is affected by the current power consumption and utilization of the system. Be
cautious of workload increases or decreases. Significant work flow changes that occur after the
system is in manual mode could lead to cabinet EPO and/or condensation.
Procedure
1. Power down all of the cabinets in the row.
a. Enter the following command in a terminal window on the SMW:
smw$
xtcli power down Hostname
Hostname
is the cabinet, system, or partition ID; examples include
c0-0
(for a cabinet),
S0
(for a
system), or
p0
(for a partition).
Preconditioner Cabinet Procedures
109