Crane Dominator 80mm Series Installation, Operation And Maintenance Instructions Download Page 1

INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS

Z9801P

Z9801PF

These instructions cover the 

general notes for the following 

Z9801P & Z9801PF 80mm  

Series units;

   Flow management system for fan coil 

units.

   Combines essential control components 

and connecting pipework into one 
compact, fully assembled unit ready  
to connect.

   The 80mm Dominator Peak Pro is 

compact and ultra lightweight.

   The bypass valve unit comprises two 3 

Way Ball valves.

   Includes the Peak Pro (Pressure 

Independent Control Valve) for  
optimum flow control.

   The strainer unit has an integral filter and 

pressure test point, plus drain cock/vent 
facility.

SYSTEM COMPONENTS

For detailed installation, operating and maintenance instructions for the system components 
that combine to make up the Z9801P/Z9801PF Series Dominator Peak Pro, please see the 
relevant sections of our website as below:

CFS_Z9801_0219

 

??????_v?

CRANE HOUSE, EPSILON TERRACE, 
WEST ROAD, IPSWICH,  
SUFFOLK IP3 9FJ

TELEPHONE: +44 (0)1473 277300
FAX: +44 (0)1473 277301
EMAIL: [email protected]

www.cranefs.com

Every effort has been made to ensure that the information contained in 
this publication is accurate at the time of publishing. Crane Ltd assumes 
no responsibility or liability for typographical errors or omissions or 
for any misinterpretation of the information within the publication and 
reserves the right to change without notice.

• 

Designed and manufactured under quality management

   systems in accordance with BS EN ISO 9001:2008

FM311 ISO 9001

For information on all other components and additional configurations please contact the  
Crane Technical Support Desk at: [email protected]

www.cranebsu.com

80mm SERIES

Z9801P

Z9801PF

D995 PEAK PRO PICV

D901/D902 METERING STATION 

INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS

Reviews: