6840070
Page 21
August, 2005
Café VII
®
Setup
INSTALLING CANISTERS
1.
Place the canister in position as shown.
2.
Engage the pins on the motor shaft with the slots in the canister coupler.
3.
Fit tabs on the front canister feet into the slots on the canister shelf.
4.
To ensure canister is correctly engaged with the rear mounting bracket,
gently push down on the front edge of the canister lid.
5.
Replace stainless steel product chutes.
FILLING CANISTERS
1.
Flip open the machine lid to gain access to the product canisters.
2.
Open each canister lid and carefully pour product into the canister.
3.
Close or replace each canister lid after filling.
LOAD PRODUCTS
PINS ON MOTOR
SHAFT MUST ENGAGE
SLOTS IN CANISTER
COUPLER
FILL
CANISTER
CANISTER
SHELF
640P0064
Summary of Contents for Cafe VII
Page 2: ......
Page 6: ...Page iv 6840069 July 2001 Café VII Setup Notes ...
Page 10: ...Page 4 6840070 August 2005 Café VII Setup EXTERNAL VIEW ...
Page 19: ...6840070 Page 13 August 2005 Café VII Setup HYDROLIFE BRAND INSTALL WATER FILTER ...
Page 20: ...Page 14 6840070 August 2005 Café VII Setup EVERPURE BRAND ...
Page 29: ...6840070 Page 23 August 2005 Café VII Setup ...
Page 75: ...6840070 Page A1 August 2005 Café VII Setup APPENDIX A FACTORY DEFAULT TIMES ...