EZ 500 Series II Melter Part Manual
Chapter 6 Maintenance Instructions
©2019 by Crafco, Inc. All Rights Reserved………………..…………………………………..….…Maintenance Instructions 6-5
6.13 Service Instructions
Step
Action
1
Do a general inspection of the machine at least once a week.
2
Replace all worn or damaged parts.
Note:
Keep regular replacement items in stock for emergency repairs to prevent
costly downtime. See
Table 6-4 Recommended Spare Parts
3
Make necessary adjustments and tighten all loose nuts or screws.
4
Watch for leaks. Tighten fittings or repair as necessary.
5
Clean the external surfaces of the machine at regular intervals.
Note:
Refer to the material manufacturer’s instructions for recommendations.
6
Follow the recommended maintenance per Table 6-1 Maintenance Chart
For service, find a list of authorized Distributors and service centers at
6.14 General Maintenance Parts
Quantity
Description
Machine
Part No.
1
Fuel Filter
All
41867
1
Oil Filter
All
45389
1
Air Filter
All
45391
1
Nozzle, Burner 1.5x80B
All
41883
1
Packing, Material Pump
All
29990S
1
Hydraulic Oil Filter
All
45438
Hydraulic Oil
All
Heat Transfer Oil
All
1
Drive Belt for generator
46100EB
45748
Table 6-2 Service Instructions
Table 6-3 General Maintenance Parts
Summary of Contents for EZ 500 Series II
Page 1: ...Parts Manual 26603 Revision K...
Page 12: ......
Page 14: ......
Page 22: ......
Page 38: ......
Page 52: ......
Page 130: ......
Page 134: ......
Page 135: ......
Page 136: ...2019 Crafco Inc...