10.2 Checklist for periodic inspection and maintenance
No. Inspection and/or service activities
Confirmation and date
1
Checking the hydraulic pressure (Recommendation:
1,5 to 2 bar)
2
Checking the tightness of the flue gas evacuation and
air inlet connections
3
Checking the automatic air vent
4
Checking the safety valve
5
Checking the siphon
6
Checking the ionization current
7
Checking the burner and heat exchanger (central
heating)
8
Inspection of the ionization electrode/ignition electrode
9
Assembling the boiler (Replace all removed gaskets)
10 Filling and refitting the syphon
11 Checking combustion (CO
2
) (Full load/Part load)
12 Number of operating hours
13 Number of successful starts (%)
14 Service message deleted or service indicator reset
15 Maintenance kit A, B or C used
16 Boiler visually inspected
17 Extra maintenance work that was undertaken
18 Confirmation of inspection
Date
(dd-mm-yy) (dd-mm-yy) (dd-mm-yy) (dd-mm-yy) (dd-mm-yy)
Company name, signature of engineer
Quinta Pro 30 - 45 - 65 - 90 - 115
10. Checklists