background image

 
 

 

Installation Manual MF-500 IoT Satellite Bridge 

 

Version 1.1 

 Date: 17 Aug 2021 

 

Copyright © 2021 CPN Satellite Services GmbH 

 

All rights reserved. This publication and its contents are proprietary CPN Satellite Services GmbH. No part 
of this publication may be reproduced in any form or by any means without the written permission of 

CPN Satellite Services GmbH, Adalbert-Stifter-Str. 15, 65375 Oestrich-Winkel, Germany. 

CPN Satellite Services GmbH has made every effort to ensure the correctness and completeness of the 

material in this document CPN Satellite Services GmbH shall not be liable for errors contained herein. The 

information in this document is subject to change without notice. CPN Satellite Services GmbH makes no 

warranty of any kind with regard to this material, including, but not limited to, the implied warranties of 

merchantability and fitness for a particular purpose. 

 

Trademarks 

 
CPN Enclosure are trademarks of CPN Satellite Services GmbH. All other trademarks are the property of 

their respective owners. 

 

Summary of Contents for MF-500

Page 1: ...many CPN Satellite Services GmbH has made every effort to ensure the correctness and completeness of the material in this document CPN Satellite Services GmbH shall not be liable for errors contained herein The information in this document is subject to change without notice CPN Satellite Services GmbH makes no warranty of any kind with regard to this material including but not limited to the impl...

Page 2: ...he antenna to the pole 6 3 Mount the IDP Terminal to the pole 7 4 Open the CPN Enclosure 8 5 Ensure all circuit breakers are switched off not plugged in 9 6 Insert the antenna cable and connect it 10 7 Switch on plug in all circuit breakers inside the Enclosure 11 8 Check if the system is operating properly 12 9 Close the CPN Enclosure 13 Any questions or suggestions 14 ...

Page 3: ... touch during power on and immediately after power off Hot surface may cause burns Terminology and Abbreviations PE PE is the abbreviation for Protective Earth and has the same meaning as the symbol Earth Ground This document uses the term earth which is the same as the U S term ground T B D To be defined value or description will follow later AC 230V A figure displayed with the AC or DC before th...

Page 4: ...costs per sensor are kept to a minimum This makes the MF 500 IoT Satellite Bridge a standalone low power low cost solution for adding satellite connectivity to your existing COTS LoRaWAN sensor devices The MF 500 IoT Satellite Bridge supports LoRaWAN version 1 0 2 The MF 500 IoT Satellite Bridge is compatible with a very wide range of commercial off the shelf COTS LoRaWAN sensors Both the MF 200 L...

Page 5: ...5 1 Mount the CPN Enclosure to the pole Mount the Enclosure to the pole by using the pole mount located at the backside of the Enclosure ...

Page 6: ...Mount the antenna to the pole Plug the antenna cable into the antenna and use its pole mount to secure it onto the top of the pole Please make sure that your installation matches antenna cable requirements ...

Page 7: ... to the pole Plug the IDP cable into the IDP terminal and use its pole mount to secure it onto the Pole We recommend using zip ties to fix the cables to the pole Please make sure that your installation matches cable requirements ...

Page 8: ...8 4 Open the CPN Enclosure Loosen the 4 marked screws of the cover and remove it from the Enclosure ...

Page 9: ...9 5 Ensure all circuit breakers are switched off Make sure all circuit breakers are switched off and pointing down ...

Page 10: ...ert the antenna cable and connect it Insert the antenna cable into Enclosure and connect to the connector located on the bottom left of the MF 200 RF depending on the cable you might need to use an SMA adapter ...

Page 11: ...11 7 Switch on all circuit breakers inside the Enclosure Connect the AC Power Cable to the main 110 to 240 V AC power source Switch on all circuit breakers ...

Page 12: ...if the system is operating properly Check if the LED on the power supply and MF 200 LoRaWAN Gateway glows green Please check whether data form the MF 200 LoRaWAN Gateway are received by the MinFarm Portal properly ...

Page 13: ...13 9 Close the CPN Enclosure Screw in the 4 marked screws of the cover to reinstall it to the Enclosure ...

Page 14: ...14 Any questions or suggestions Do not hesitate to contact us Version 1 1 Date 17 Aug 2021 Created by Christian Nicolai info cpn de 49 6723 913480 https www cpn de ...