background image

iMove-C Assembly Manual

(Motorized Version-M1/M2)

Summary of Contents for iMove-C

Page 1: ...iMove C Assembly Manual Motorized Version M1 M2 ...

Page 2: ...cessories Section 4 Care Maintenance FAQ Troubleshooting Section 5 Contact Us 14 15 17 19 24 Unpack and Identify Parts Assemble Cross Rail to Columns Connecting Desktop Supports to Columns Assemble Work Surface Support Frame Attach Work Surface to Support Frame Replace Cross Rail Cover and Trim Attach Control Panel Leveling Calibrating Desk 6 6 8 9 10 11 12 13 coronagroupinc 205 941 1942 coronagro...

Page 3: ...3 Work Surface Support Frame Support Frame Spanners Gas Cylinder Gas Cylinder Cross Rail Cover Cross Rail Leg Foot pic 1 coronagroupinc 205 941 1942 coronagroupinc com ...

Page 4: ...8mm Nut Driver or Box Wrench Thumb Bolts 2 ea M6 x 1 0 x 40 Socket Cap Bolts 4 ea M6 x 1 0 x 16 Socket Cap Bolts 4 ea M5 x 25 Flat Head Screws 8 ea M5 x 20 Socket Cap Bolts 8 ea M5 x 16 TORX Button Head s 8 ea 20mm SPAX Wood Screws 12 ea 4 x 16 Wood Screws 3 ea 8mm Hex Nuts 8 ea 4 Zip Ties 3ea Zip Tie Base 3ea Control Panel Mounting Plate 1ea coronagroupinc 205 941 1942 coronagroupinc com ...

Page 5: ...5 Section 1 Basic Assembly of Desk Shipped KD knock down Motorized Version M1 M2 coronagroupinc 205 941 1942 coronagroupinc com ...

Page 6: ...viding their own custom top determine the weight of the top and contact us to order the appropriate gas cylinders This step should have been completed at order entry Use caution when working with compressed gas cylinders An uncontrolled release could cause severe damage and or personal injury 1 Identify and uncrate ALL parts pic 1 2 Assembling Cross Rail to Columns Legs Work Surface Support Frame ...

Page 7: ...th the approximate center of the drive shaft gear when the leg is at max height pic 7 Once cross rail is secured to legs make sure the gear is seated with the geared track then tighten shaft support bracket bolts pic 8 d pic 5 pic 6 pic 7 screws for shaft support screw from below cross rail long bolt short bolt TIP pic 8 Basic Assembly of Desk Shipped KD knock down Assembling Cross Rail to Columns...

Page 8: ...el to outside edge pic 11 DO NOT remove square nut at the end of the cylinder It should be screwed down completely on the cylinder and be UNDER the cover plate once assembled pic 11 pic 9 pic 10 Basic Assembly of Desk Shipped KD knock down DO NOT attempt to operate desk once the gas cylinders are installed and before top is attached The force of the cylinders without the weight of the top could da...

Page 9: ... Secure support frame to inside of columns with 4 bolts pic 13 Basic Assembly of Desk Shipped KD knock down pic 13 pic 12 a b WARNING Examine underside of worktop Make sure drillings match top drawings Top MUST fit flush on work surface support frame If accurate proceed to Step 5 Generic Drilling Diagram your diagram may be different coronagroupinc 205 941 1942 coronagroupinc com ...

Page 10: ...cess in the work surface pic 14 Place Desktop on floor with drillings visible Flip Frame upside down and align holes to drillings pic 15 Align the threaded inserts with holes in the support plates Use the 8 bolts provided to attach the work surface pic 16 a b pic 14 pic 16 WARNING The iMove Series uses a variety of top thicknesses VERIFY length of wood screws are appropriate for the thickness of t...

Page 11: ...9 6 pic 18 pic 19 cross rail as seen from below Basic Assembly of Desk Shipped KD knock down a b Align cover on top of cross rail Screw cover to cross rail using the 8 8mm hex nuts removed in Step 2 pic 18 19 coronagroupinc 205 941 1942 coronagroupinc com ...

Page 12: ...rol Panel M1 or M2 7 Locate the pre drilled holes on the underside of the work surface Use a 1 Phillips Drive bit Once mounted Control Panel should slide in out approximately 1 do not over tighten pic 21 Attach cord to the underside of the desk so that it hangs vertically from the cross rail pic 22 pic 20 pic 21 fix cable here pic 22 a b c M2 Control Panel coronagroupinc 205 941 1942 coronagroupin...

Page 13: ...desk will be fully functional 1 With the desk plugged into a standard power outlet M2 only control panel IS illuminated and flashing 000 press and hold the down arrow on the control panel 2 Hold the down arrow until the desk reaches lowest position and stops 3 For M1 Hold the down arrow at lowest position for 3 seconds M2 only Continue pressing the down arrow until the LED stops flashing and reads...

Page 14: ...14 Section 2 Attaching the Desk to the Lowboard Pedestal coronagroupinc 205 941 1942 coronagroupinc com ...

Page 15: ...k to provide a straight entry for the leg Then carefully Insert the table leg into the provided cut out in the lowboard pedestal and seat leg into the recessed support plate pic 25 26 pic 26 pic 27 From inside the lowboard pedestal bolt the cross rail to the top of the lowboard pedestal pic 27 28 pic 28 a b c coronagroupinc 205 941 1942 coronagroupinc com ...

Page 16: ...Chain to underside of Desk Top above the lowboard pedestal pic 31 pic 30 Attaching Desk to Lowboard Pedestal cont pic 31 d e NOTE f Position mounting bracket for Cable Chain at 90º angle prior to fastening Raise Desk to highest position Allow length of Cable Chain to enter lowboard pedestal 2 Remove any excess Cable Chain from interior of cabinet coronagroupinc 205 941 1942 coronagroupinc com ...

Page 17: ...17 Section 3 Accessories coronagroupinc 205 941 1942 coronagroupinc com ...

Page 18: ...s included in the Accessory Box See instructions included in the Accessory Box See instructions included in the Accessory Box If not factory installed install using templates and instructions provided If not factory installed install using templates and instructions provided CPU Holder See instructions included in the CPU Holder Box coronagroupinc 205 941 1942 coronagroupinc com ...

Page 19: ...19 Section 4 Care and Maintenance FAQ Troubleshooting coronagroupinc 205 941 1942 coronagroupinc com ...

Page 20: ...cratches Lubrication Every desk should be fully lubricated at the factory Should additional lubrication be required apply a small aount of lithium grease as needed Only apply lubricant to moving parts within the cross rail Excess lubricant on exposed surfaces of the desk should be cleaned with warm soapy water and a soft cloth 1 2 TIP coronagroupinc 205 941 1942 coronagroupinc com ...

Page 21: ...rupted the LED readout on the control panel will flash 000 continuously M2 only Follow these reset procedures 1 With the desk plugged into a standard power outlet M2 only control panel IS illuminated and flashing 000 press and hold the down arrow on the control panel 2 Hold the down arrow until the desk reaches lowest position and stops 3 For M1 Hold the down arrow at lowest position for 3 seconds...

Page 22: ...eight bearing on desk top Max power on time exceeded Control reactivates after approx 9 minutes automatically Defective Drive Contact Customer support Defective Control Panel Contact Customer support Desk is slowly moving downward Control expects new initialization See Page 21 Desk is moving upwards shortly and stops Max additional load exceeded Reduce weight Desk is moving downwards shortly and s...

Page 23: ...plug Contact Customer Service Pull power plug Check Cable to motors and clear short circuit E29 E30 Impluse Timeout M1 Impluse Timeout M2 There might be an overload up remove excess weight on desk top down remove excess weight on desk top E67 E68 E69 E44 E45 E54 E70 MOS FET Temperature Detector Temperature Internal error Overcurrent on M1 Overcurrent on M2 Overcurrent on control Overcurrent on mot...

Page 24: ...24 Section 5 Contact Information coronagroupinc 205 941 1942 coronagroupinc com ...

Page 25: ...ical information and help contact the following Operations Production Manager Paul Allen p 205 329 7065 e paul allen coronagroupinc com Customer Service Alicia Burrow p 205 329 7057 e alicia burrow coronagroupinc com Customer Service Shawn Dyck p 205 329 7070 e shawn dyck coronagroupinc com ...

Reviews: