1.  General
2.  Set contents
3.  Opening side conversion
4.  Frame Installation
5.  Incoming cable installation and splicing
6.  Splitter version.
7.  Installation in 21" frame.

Warning!

Possible laser/LED radiation in the non-visible spectrum!

Never look into open fiber ends if the level of risk from laser/LED radiation is not known.

Important

The assignment of the risk level must be specified definitively by the site technician/operator responsible for 

the communications facility and must be indicated accordingly (e.g. by attaching standard-compliant warning 

signs as per the current edition of DIN EN/IEC 60825-1, and in accordance with the current edition of BGV B2 

“Laser radiation”). If there is any change in the technical data relating to the risk level, the warnings must be 

adapted accordingly and occupational safety precautions must be taken if required, see also e.g. the current 

edition of DIN EN/IEC 60825-2.

1. General

This unit is designed for connectorization in two configurations: as a patching unit or splitting unit. It can be fixed in standard 

19 inches frames and 21 inches frames with use of alternative brackets. Subrack is preassembled with up to 40 SC APC 

adapters, 3 FRM splice trays or 1 tray and splitter in second variant. Subrack has an easy and full front access and can 

be opened on both sides after simple on-site conversion.

1.1 

Tools required

1. Philips screwdriver

2. Open end wrench no.10

Summary of Contents for UNISUB 1U

Page 1: ...Installation Instruction Issue 1 November 2013 UNISUB 1U UNISUB 1U Splitter These instructions are provided as a guideline for the trained craftsperson ...

Page 2: ...n of DIN EN IEC 60825 1 and in accordance with the current edition of BGV B2 Laser radiation If there is any change in the technical data relating to the risk level the warnings must be adapted accordingly and occupational safety precautions must be taken if required see also e g the current edition of DIN EN IEC 60825 2 1 General This unit is designed for connectorization in two configurations as...

Page 3: ...rs splitter 2 Spiral wrap 3x0 75m 3 Nozzle 4 Cage nuts with screws 4x 5 Cable ties 6 Installation instruction 7 Default cable guide 8 Spring plunger 2 1 Accessories ordered separately 1 Cable guide left 2 Cable guide right 3 Bracket set for 21 frame left right 1 2 3 7 3 2 4 5 6 1 8 ...

Page 4: ...rom point 3 1 to fix hinge on the other side of subrack Final step is to remove tube holder from left mounting plate and fix it to the right also at the bottom Note make sure to collect and re use all parts screw nut and nylon spacer Note above operation can be also carried out after installation in the frame however it requires free space above and below subrack PRESS PRESS and press it in on the...

Page 5: ... the required position NOTE Make sure there are correct spaces between cage nuts and cage nuts are at the same level on both sides of the frame Pic 2 4 2 Use the enclosed screws to fix mounting plate on the right side of the frame 4 3 On the left side of the frame install the subrack Insert right side into the mounting plate for easier installation To use side cable guides leave screws not tighten...

Page 6: ...to splice cassette as shown in the picture 5 2 Cut spiral wrap at 75 cm length and fit one end into the transparent nozzle Insert other end of nozzle at the protective tube Slingle spiral wrap Double spiral wrap NOTE Use 2 spiral wraps for each nozzle If number of spiral wraps is uneven reverse nozzle with wider end to protective tube and fit single spiral wrap 5 3 Insert protective tube with atta...

Page 7: ...plice cassette which might be accessed directly with protective tube NOTE After installation secure the spiral wrap with locking bolts 5 5 Wrap insulation tape at the end of spiral wrap and secure it to the cassette with two cable ties Optionally spiral wrap can be fixed with plastic element cut off from the cassette just like pre installed cables NOTE Spiral wrap should be fitted while subrack is...

Page 8: ...t in strict compliance with the local laws currently in force Disclaimer Corning Cable Systems Polska Sp z o o accepts no liability for any damage arising from improper use of the product The extent of any liability in specific instances shall be limited to the General Terms and Conditions of Sale from Corning Cable Systems Polska Sp z o o This product is state of the art 7 Installation in 21 fram...