3.
Grounding
Before power up:
a. Confirm equipment is well grounded;
b. Confirm equipment is connected to OCH via optical fiber;
c. Confirm equipment antenna ports are either connected to load or measuring
instruments.
- Lan cable to computer can be connected before or after power up.
2.3 POWER UP AND INDICATORS
Before power up, please check product voltage requirement, and make sure the
equipment is with good grounding protection.
Warning:
Always be caution to voltage safety. Before hands-on operation, check if the
equipment is powered off and disconnected from power supply or otherwise will
cause personnel injury and equipment damage.