
IDC 255 Progate Drive Thru Installation Manual
Publication Number: 621057419INS
- 6 -
© 2006, IMI Cornelius Inc.
4.
Connect the beverage system product tubes as indicated in applicable Flow Diagram in this manual
or on the back of the splash panel. This work should be done by a qualified service person.
NOTE: See applicable Flow Diagram or Decal on the lower front of the unit for the location of
syrup and water connections.
5.
Clean the hopper interior.
6.
Connect the unit power cord to a 120 volt, 60 cycle, 3–wire grounded receptacle. For 220-240 Volt
International Units, a 3-wire power cord is provided. An adapter plug for the particular country will
need to be provided by the Installer.
A
DJUST
C
ARBONATOR
CO
2
R
EGULATOR
AND
T
URN
W
ATER
I
NLET
S
UPPLY
L
INE
ON
1.
Open (counterclockwise) CO
2
cylinder valve slightly to allow lines to slowly fill with gas, then open
the valve fully to back-seat the valve. (Back-seating the valve prevents leakage around the valve
shaft).
2.
The carbonator CO
2
regulator is fixed at a nominal 75 psi.
3.
Open one of the post-mix dispensing valves to exhaust trapped air inside the carbonator tank.
4.
Open the water inlet supply line shutoff valve.