6.1
Maintenance table
Notice!
The following table provides information on recommended maintenance in-
tervals to be adapted to the relevant installation situation.
Interval
Components
Action
Daily
Tower, outside
Clean. See the document
“Tower
operator manual”, document no.
TD0000000
.
Daily
Tower, outside
Perform a visual inspection. See
the document
“Tower operator
manual”, document no.
TD0000000
.
Every 3 months
Tower, inside
.
Every 3 months
Diffusor seal
Perform visual inspection,
.
Every 3 months
Nozzle inlay O-ring
Perform visual inspection,
.
Every 3 months
Nozzle inlay O-ring