Copyright © 2021 CoreTigo Ltd.
TigoStarter K22
User Manual
Page
35
of
43
5.2. EtherNet/IP Protocol
Follow the steps below to configure users’ local PLC and establish a PLC connection over EtherNet/IP.
Note:
It is the user’s responsibility to install and activate the required
Studio 5000
software tool
locally in order to establish a PLC connection through the EtherNet/IP protocol.
1. Establish a connection between a PLC subnet and the TigoMaster 2TH IO-Link Wireless Master.
2. Open the
Studio 5000
software tool.
3. Click the
Logix
option under the
New Project
window in the application.
4. Click the relevant file in the list.
5. Click the
Next
button.
Figure 36
– New Project
6. Select the
Register a Single File
option in the
Rockwell Automation’s EDS Wizard
window.
7. Click the
Next
button.
Figure 37
– Watch Table