Coolaroo FAIRHAVEN Assembly Manual Download Page 1

3

A S S E M B L Y   G U I D E

GAZEBO

F A I R H A V E N

WAR

RANTY

WARRANTY

YEAR

2

Summary of Contents for FAIRHAVEN

Page 1: ...3 A S S E M B L Y G U I D E GAZEBO F A I R H A V E N WARRANTY WARRANTY YEAR 2 ...

Page 2: ...nglasses and seek shade Attention The illustrations in this manual are for assembly and operation purposes only They may differ from the gazebo s actual appearance When not in use for long periods of time dismantle the gazebo and store in a dry place Components subject to turning and sliding can be treated with a non staining lubricant spray silicon based CARE MAINTENANCE To register your product ...

Page 3: ...EF QTY REF QTY BOX 1 4 A 4 pcs I 4 pcs J 4 pcs K 45 pcs L 1 pc M 23 pcs N 4 pcs O 24 pcs P 48 pcs Q 96 pcs R 12 pcs S 25 pcs T 1 pc U 1 pc V 1 pc W 16 pcs X 1 pc Y 2 pcs manual 1 pc BOX 2 4 B1 1 pc B2 1 pc C 2 pcs G 1 pc H 1 pc BOX 3 4 D 12 pcs BOX 4 4 D 11 pcs ...

Page 4: ...5 ...

Page 5: ...6 ...

Page 6: ... and safety equipment shown in figure 1 STEP 2 Slide a collar I over the bottom of one of the leg sections A as shown in figure 2 with the rounded part of the collar facing towards the top of the leg Position base plate J over the bottom of the leg section and affix to the leg using 6 bolts O Repeat this process for the other three legs A S S E M B L Y ...

Page 7: ...two of the leg sections A on the ground as shown below Take the B1 rail and slide each end into position in the grooves along the top of the leg sections Use large allen key Y to affix the four screws on each corner ...

Page 8: ...two leg sections A on the ground as shown Take the B2 rail and slide each end into position in the grooves along the top of the leg sections just like the previous step Use large allen key Y to affix the four screws on each corner ...

Page 9: ...set up two ladders Lift up one side wall made up of two legs and a rail and raise one end of the beam C above the opening on the leg section A Carefully slide the guides on the beam C down into the slots on the leg section A Use large allen key to drive in four more screws A S S E M B L Y ...

Page 10: ...11 STEP 6 Move the ladders to the other side of the structure Install the other beam C onto the open end using the same method as in Step 5 ...

Page 11: ... B1 rail with the crank pin hanging down Remove the screw from the crank pin temporarily Slide the crank loop V over the pin lining up the holes Drive the screw through both parts Insert the hook of the crank handle H through the crank loop V ...

Page 12: ...Take the louvre arm plate L and position it on the inside of the left end of the louvre Use two of the 18mm screws Q to affix the controller to the louvre Find one of the louvre plates K and position it on the inside of the right end of the louvre Screw the plate in place using two more of the 18mm screws A S S E M B L Y 8 ...

Page 13: ...socket on the B1 rail just above the crank handle Insert the crank bolt of the louvre arm into the crank socket Insert the pin on this end of the louvre into the second hole position on top of the B1 rail Place the pin on the other end of the louvre in the second slot position on top of the B2 rail ...

Page 14: ...15 STEP 10 Back on the other side where the crank handle is secure the crank bolt from the louvre arm into the socket on the B1 rail using an M6 bolt U and washer T Tighten with the small allen key X ...

Page 15: ...he other side of the louvre secure the louvre pin into the second position slot by placing a small cover M on top of the slot section lining up the holes Screw the cover in place using two M5 screws P A S S E M B L Y ...

Page 16: ...17 STEP 12 For each of the remaining 22 louvres position a louvre plate K on the inside of each end Affix each of the plates into place using two 18mm screws Q 22 times ...

Page 17: ... louvre is in the same orientation as the one already installed insert the pin on the crank handle end into the first hole position on the B1 rail Place the pin on the other end of the louvre into the first position slot Place a small cover M on top and screw down in place using two M5 screws P ...

Page 18: ...gned to remain closed Rotate the louvre and leave it open in a vertical position Install the remaining louvres in the same way as before Ensure each louvre is in the same orientation insert the pin on one end of the louvre into the hole on the B1 rail place the other pin into the slot on the opposite end and screw down the small cover M with two M5 screws P A S S E M B L Y ...

Page 19: ...louvre guide rail G and line up the holes with the free louvre pins on the crank handle side Put the louvre guide rail over the pins as shown below Push the straight section of a humpback pin S through the small hole of each pin protruding through the guide rail ...

Page 20: ... the feet of the gazebo into the ground For a hard surface such as concrete or tile drill holes into the surface through the holes in the feet and install the supplied anchor bolts W For other surfaces use another suitable fastener to secure the gazebo down Louvres must remain open when gazebo is unattended to avoid damage during periods of moderate to strong winds ...

Page 21: ...22 ...

Page 22: ...way from assembly area Check all nuts and bolts for tightness before and during usage Non permanent structure Do not use in extreme weather conditions including heavy rain or high winds Do not leave the gazebo unattended Do not place the product near an open flame or too close to any heat source Louvres must remain open when gazebo is unattended to avoid damage during periods of moderate to strong...

Reviews: