![Conti TWIN STAR 2 Technical Documentation Manual Download Page 11](http://html1.mh-extra.com/html/conti/twin-star-2/twin-star-2_technical-documentation-manual_2656567011.webp)
Wait for 5 seconds to go out of the programming mode before making coffees.
During the programming of one group, the other groups do not work (including the hot water).
The data are stored even if the machine is switched off.
7.2.2 Programming of tea measure :
Insert and turn the programming key. The displays indicate:
Water volume
Programming
Parameters
Programming
Parameters
Programming
Press the push-button
CAPPU.
The LED of the CAPPU button
blinks
: PROGRAMMING MODE.
Press the HOT WATER button to program: the hot water solenoid valve is activated.
When the hot water measure is reached, press the hot water button again to stop the flow.
The data is stored.
NOTES:
Maximum flow time of the hot water measure:
120 seconds.
Wait for 5 seconds to go out of the programming mode before starting the flow.
The data are stored even if the machine is switched off.
7.2.3
Programming of steam measures
:
If the machine is fitted with this optional device the steam programming is available in the
PROGRAMMING MODE (“Bar” menu”) – see chapter 5.6. PROGRAMMING
7.3 Beverage
preparation
7.3.1 Coffee delivery:
The machine has to be switched on and the security water level in the steam boiler reached
(sensor SS).
Machine switched on and no delivery: all the LEDs are lit.
Press the push-button to deliver the programmed coffee measure (each push-button could be
programmed with a different measure – see PROGRAMMING MODE).
To stop the coffee flow press one of the 5 push-buttons of the operating group (except the push-
button CAPPU of the left group)
Press the selected push-button:
- The pump and the solenoid valve of the group are activated.
- The LED of the selected button is lit, the other LEDs of the group are turned off.
- The LEDs of the other groups are lit, the “Cappuccino” LED is also lit.
The flowmeter detects the volume of water. When the programmed quantity is reached
- the flow stops automatically,
- the pump and the solenoid valve of the group are deactivated.
9
Summary of Contents for TWIN STAR 2
Page 2: ......
Page 37: ...12 ELECTRIC DRAWING 12 1 CPU board 35 ...
Page 41: ...12 3 Power circuit for 230 V 3AC 6 6 0 6 0 1 2 2 1 0 2 8 06 07 93 1 92 91 0 04 6 05 39 ...
Page 42: ...12 4 Relays box for 400 V 3NAC 230 V 1NAC 40 ...
Page 43: ...12 5 Relays box for 230 V 3AC 2 1 0 2 0 0 2 2 1 0 1 0 0 2 1 2 1 1 0 1 2 41 ...
Page 44: ...13 HYDRAULIC DRAWING Σ Σ Hydraulic diagram Twin Star 2 42 ...