10
Checking the delivery / storage and transport
3
Checking the delivery / storage and transport
3.1
Checking the delivery
The Condair RH is delivered together with the corresponding steam distribution unit as a complete pack-
age. Please refer to the information on the scope of delivery in the installation and operating instructions
of the corresponding steam humidification system.
After receiving:
– Inspect shipping boxes for damage.
Any damages of the shipping boxes must be reported to the shipping company without delay.
– Check packing slip to ensure all parts has been delivered.
All material shortages are to be reported to your Condair supplier within 48 hours after receipt of the
goods. Condair Group AG assumes no responsibility for any material shortages beyond this period.
– Unpack the parts/components and check for any damage.
If parts/components are damaged, notify the shipping company immediately.
– Check whether the components are suitable for installation on your site according to the unit data
stated on the specification label.
3.2
Storage and Transportation
Storing
Until installation store the Condair RH in its original packaging in a protected area meeting the following
requirements:
– Room temperature: 5 ... 40 °C
– Room humidity: 10 ... 75 %rh
Transportation
For optimum protection always transport the Condair RH and components in their original packaging
and use appropriate lifting/transporting devices.
Packaging
If the packaging is to be disposed of, observe the local regulations on waste disposal. Please recycle
packaging where possible.
Summary of Contents for RH 1.8
Page 66: ...Notes...
Page 67: ......