![Condair DRAABE HighPur Installation And Operating Instructions Manual Download Page 37](http://html1.mh-extra.com/html/condair/draabe-highpur/draabe-highpur_installation-and-operating-instructions-manual_2651714037.webp)
37
Electrical cable specifications
11 Electrical cable specifications
11.1 Connection cable for nebulizers
Designation
JZ-600 5x 0.5 mm² (with protective earth green/yellow)
Art. no.
142016
Intended use:
For voltage supply and signal transmission between: DRAABE
HumPower II to the nebulizer (junction box)
Peak operating voltage:
1 kV
Minimum bend radius
4 x DA
Test voltage:
4 kV
Temperature range:
Fixed installation: -20°C to 70°C
Mobile installation: -5°C to 70°C
Ambient humidity [%rH]
Max. 95%, prevent condensation
Designation
YSLY-JB 5x 0.5 mm² (with protective earth green/yellow)
Art. no.
142081
Intended use:
For voltage supply and signal transmission between: DRAABE
HumPower II to the nebulizer (junction box)
Peak operating voltage:
500 V
Minimum bend radius
Fixed installation: 4x DA
Mobile installation: 15 x DA
Test voltage:
2 kV
Temperature range:
Fixed installation: -40°C to 70°C
Mobile installation: +5°C to 70°C
Ambient humidity [%rH]
Max. 95%, prevent condensation
Summary of Contents for DRAABE HighPur
Page 1: ...2603250 0 EN 2112 INSTALLATION AND OPERATING INSTRUCTIONS Humidification system DRAABE HighPur...
Page 41: ...Notes...
Page 42: ...Notes...
Page 43: ......