
Revision: 01 02/29/2016
Page 8
Condensate Drains
3/4”
Chilled Water Supply
3/4”
Chilled Water Return
3/4”
PHYSICAL DATA
Length
12.00”
Width
46.38”
Height
78.75”
Unit Weight (Lbs.)
250
INSTALLATION
Prior to placing the unit make sure proper clearances are available:
Front
36”
Rear
36”
UTILITY CONNECTIONS
Electrical connection access for the unit is located on the left front of the top panel and piping
connection could be brought from the rear top panel of the unit. Provide isolation shut off
valves for all pipes external to the unit.
AIR FLOW
The return air is drawn through the back of the unit and discharged into the room through the
front of the unit.
CONNECTIONS
In connecting the unit, five items must be addressed. They are
1.
Structural Support
2.
Electrical Supply
3.
Condensate Drain Connection
STRUCTURAL
SUPPORT
The unit can be installed directly on the floor or on the raised floor without the need for any
special support. The floor should be level.