
Revision: 01 02/29/2016
Page 21
CHECK ALL DIGITAL OUT PUTS
Alarm set points
TEMPERATURE: HIGH: ___ LOW:
HUMIDITY: HIGH: ___
LOW:
(NOTE ANY CHANGES MADE TO THE CONTROLLER SETTINGS)
Condensate Pump
WET TEST: ___
TECHNICIAN COMMENTS
NOTE ALL READINGS AND ANY ADJUSTMENT MADE AT THE JOB SITE:
ANY VISUAL DAMAGE: