RECEIPT OF UNIT AND TRANSPORTATION
Upon receipt of the unit, a visual inspection is required. The unit packaging should be entirely intact
and the crate should not be damaged. Transport the unit to the desired location in the upright
position to avoid damaging to any external panels or internal components. Once the unit is
uncrated and in the desired location, inspection of the unit for any external damage is crucial as this
may be indicative of internal damage. Any signs of damage to the packaging or system panels or
incomplete shipments require a claim to be filed with the shipping company. Freight damage claims
are the responsibility of the receiver.
Any items designated as field installed shall be packaged inside of the unit and must be removed
and installed prior to startup of the equipment.
Optional articles such as jack-stand parts, condensate pump, and remote control panel are packaged
separately.
REPORT ANY DAMAGE TO THE CARRIER. COMPU-AIRE IS NOT RESPONSIBLE FOR FILING OF ANY
CLAIMS. ALL NEEDED INSPECTION AND CLAIM FILING IS THE RESPONSIBILITY OF THE RECEIVER
Figure 2 Transportation
5.1
TRANSPORTATION MODE
Visual inspection of the outer casing provides a simple indication of possible internal damage to the
equipment. Move the unit to the installation site in the upright position.
FILE A CLAIM WITH THE SHIPPING COMPANY IF THE SHIPMENT IS DAMAGED OR INCOMPLETE.
FREIGHT DAMAGE CLAIMS ARE THE RESPONSIBILITY OF THE RECEIVER.
Optional articles such as jack stand parts, condensate pump, and remote control panel are packed
inside the unit.